BrewFermentLab

10-Gallon 1.060 Ale — Three-Step Yeast Starter

Two 100-billion-cell packages are 14 days old. The stages use 0.75 L, 1.25 L and 2 L of fresh starter wort.

418.5 billion Target cell count185.4 billion Viable cells from packs

Inputs

Measurement system
Wort and pitch rate
L
SG
Yeast package

Choose the storage assumption for your liquid culture. Set 100% and enter a measured viable count when available.

billion
%
Starter stages

A zero volume skips that stage. Each stage uses the predicted cells from the prior stage and a fresh wort volume.

SG
L
L
L

Results

Target cell count

418.5billion
Estimated pack viability
92.7%
Viable cells from packs
185.4billion
Cells after planned stages
552.2billion
Remaining shortfall
0.0billion
Single-stage volume from packs
1.78L
DME for a single stage
182.9g
Additional starter volume
0.00L
DME for the additional stage
0.0g
DME for planned stages
410.8g
Wort extract
14.74°P
Package age
14days
StageStarter wortDMEEnding cells
Step 10.75L77.0g225.4billion
Step 21.25L128.4g347.8billion
Step 32.00L205.4g552.2billion
Cells from package to pitch
Cells from package to pitch100200300400500600Pack123Cells (billion)Starter stagePitch targetPackagePackageStep 1Step 1Step 2Step 2Step 3Step 3
  • Storage and starter growth are estimates. Enter the package’s own cell count and use measured viability when available.

Worked calculation

  1. The five-gallon pitch at this gravity scales linearly with volume. At ten gallons the target is about 418.5 billion cells.
  2. Each stage starts with the previous stage’s count. The modeled counts are 225.4, 347.8 and 552.2 billion cells.
  3. Four liters of fresh wort at 1.036 and 42 PPG requires about 410.8 g DME across the stages.

See the full calculator equations and input ranges.

References

Questions

Can I enter a third starter stage while leaving stage two blank?

Enter consecutive stages. Each row models the cells transferred from the immediately preceding stage.

Why might I choose fewer starter stages for this ale?

The output shows whether a planned stage already reaches the target. Every additional stage adds time, wort and handling.