A = h(c + a) + R²(θ − sin θ cos θ)
Qᵥ = 3,600 A v | Qₘ = Qᵥ ρ / 1,000
Three equal-roll trough geometry, with center roll width c = B/3 and usable belt width 0.9B − 2 in. The loaded wings have horizontal projection a and rise h. Surcharge θ is the edge tangent angle of a circular cap, with R = (c + 2a)/(2 sin θ). The cap vanishes at 0°. Match the actual idlers, edge clearance and loading condition for detailed work.
Historical CEMA running tension
Tₑ = L Kt [Kx + (Ky + 0.015) Wb] + Wm (L Ky + H) + Taux
Kx is idler resistance per unit length, Wb and Wm are belt and material weights per unit length, L is centerline length, and H is lift. Use consistent force and length units. Enter pulley, skirt and loading components as one ancillary running pull. The starting, stopping, take-up, sag and rollback checks require a separate conveyor design.
Use wrap θ in radians and Tₑ in newtons with v in m/s for kW. The tensions are the ideal minimum pair at incipient slip. Belt rating, take-up and traction allowances must be established for the installation.
Geometry only. Check rollback and belt rating separately.
Inputs
Belt width
36 in
Trough angle
35°
Surcharge angle
20°
Bulk density
95 lb/ft³
Belt speed
425 FPM
Belt length
180 ft
Vertical lift
25 ft
Drive pulley wrap
200°
Pulley friction μ
0.35
Belt mass per length
8 lb/ft
Idler resistance Kx
0.35 lbf/ft
Flexure factor Ky
0.03
Temperature factor Kt
1
Other running pull
80 lbf
Drive efficiency
93%
Calculated values
Mass throughput
1,231.731TPH
Motor power
43.547HP
Effective tension Te
3,144.633lbf
Minimum tight side T1
4,458.699lbf
Minimum slack side T2
1,314.067lbf
Minimum traction T1/T2
3.393
Load cross-section
1.017ft²
Area inside trough
0.716ft²
Area above trough
0.301ft²
Volume throughput
25,931.174CFH
Running resistance
729.474lbf
Lift tension
2,415.158lbf
Pulley shaft power
40.499HP
Conveyor incline
7.984°
Industrial machinery and mobile equipment can cause fatal injuries. Use these estimates for preliminary sizing. Follow the MSHA or OSHA requirements that apply at your site. Guard moving parts and nip points, and use site lockout/tagout and hazardous-energy isolation procedures before service. Have qualified personnel verify equipment selection and operating limits.