Worked example · Bucket Elevator

Centrifugal sand elevator

An 80-foot elevator raises dry sand in spaced centrifugal buckets and discharges over a 24-inch head.

Live results

Head, loaded strand and boot

Edit inputs
Head, loaded strand and boot Four live readings and a schematic of the selected material-handling configuration. Full values follow the diagram. THROUGHPUT253.85TPHHEAD SPEED62.07RPMCRITICAL SPEED54.17RPMMOTOR POWER25.33HP ELEVATOR LEGCONVEYING PATHBoot inletHead dischargeCentrifugalLift 80 ftPitch 14 inHead Ø 24 inFill 75% Head speed / critical speed114.59%Speed is consistent with the selected discharge mode.

Speed is consistent with the selected discharge mode.

All calculated values
Mass throughput
253.848TPH
Headshaft speed
62.07RPM
Critical centrifugal speed
54.166RPM
Motor power
25.335HP
Volume throughput
6,769.286CFH
Material lift power
20.513HP
Digging power
1.538HP
Headshaft power
22.801HP
Headshaft torque
23,152.253lb-in
Head speed / critical
114.594%

Inputs

Unit system
Operating inputs
ft³
%
in
FPM
ft
lb/ft³
in
Drive & model factors
ft
Set from equipment data. Gravity-fed continuous buckets may use a smaller allowance.
HP
%

Worked solution

Starting case in US units

  1. At 75% fill and 14 in spacing, the buckets deliver 6769.29 CFH, corresponding to 253.85 TPH.
  2. The 24 in head turns at 62.07 RPM. Compare it to the 54.17 RPM centrifugal reference.
  3. Combine 20.51 HP lift, 1.54 HP digging and 0.75 HP idle power. The shaft requires 22.8 HP and develops 23152.25 lb-in.

Try it. Compare the calculated head RPM with the critical RPM, then inspect how much headshaft power is attributed to digging.

More worked examples

Open a different starting case

Equations and assumptions

Bucket delivery and head speed

Qᵥ = Vbucket · f · (v/p) · 3,600   |   N = 60v/(πD)

Bucket fill f and pitch p describe one row of buckets. The rate assumes steady full-width feeding at the specified bucket loading. Belt or chain pitch speed and head diameter must use consistent units.

Centrifugal reference

N꜀ = (60/2π)√(g/R) ≈ 29.90/√Rₘ ≈ 42.29/√Dₘ

R is half of the head pulley diameter D. The metric coefficients use metres for Rₘ and Dₘ. The check compares pulley acceleration with gravity. Centrifugal buckets discharge by throwing material, while slower continuous elevators rely on gravity and bucket shape. Use the effective radius of the real bucket lip to check trajectory and discharge.

Shaft load and torque

Pshaft = ṁg(H + Hdig) + Pempty
Pmotor = Pshaft/η   |   τ = Pshaft/(2πN/60)

Hdig is an editable equivalent material lift for digging resistance. Specify empty running power separately. Calculate startup, chain or belt tensions and backstop requirements with the manufacturer.

References