Worked example · Crusher & Bond Energy

Secondary granite cone crusher

A secondary cone takes granite from a primary circuit. The illustrative work index is 14 kWh per short ton.

Live results

F80 to P80 reduction and Bond energy curve

Edit inputs
F80 to P80 reduction and Bond energy curve Four live readings and a schematic of the selected material-handling configuration. Full values follow the diagram. REDUCTION6.91BOND ENERGY0.73kWh/short tonNET POWER280.47HPMOTOR POWER308.21HP CRUSHING SECTIONBOND ENERGY CURVEFeed F803.8 inProduct P800.55 inFeed sizeFiner product Reduction in 80% passing size85.53%Use a tested work index and circuit corrections for design.

Use a tested work index and circuit corrections for design.

All calculated values
Reduction ratio F80/P80
6.909
Bond specific energy
0.734kWh/short ton
Net comminution power
280.474HP
Motor power
308.213HP
Decrease in P80 size
85.526%

Inputs

Unit system
Operating inputs
in
in
kWh/short ton
TPH
Drive & model factors
%

Worked solution

Starting case in US units

  1. Divide feed F80 of 3.8 in by product P80 of 0.55 in to obtain a 6.91:1 reduction ratio.
  2. Convert both sizes to µm and use Wi = 14 kWh/short ton in the Bond equation. The energy estimate is 0.73 kWh/short ton.
  3. At 285 TPH feed, estimated net power is 280.47 HP. Applying drive efficiency of 91% gives a 308.21 HP motor estimate.

Try it. Switch to metric units to verify that the displayed specific energy changes basis while calculated physical power stays the same.

More worked examples

Open a different starting case

Equations and assumptions

Use 80% passing sizes

RR = F₈₀ / P₈₀

F80 and P80 are the sizes through which 80% of the feed and product mass pass. Reduction ratio uses equal size units. The Bond equation converts both to micrometres.

Bond Third Theory

W = 10 · Wᵢ · (1/√P₈₀ − 1/√F₈₀)
Pnet = W · Qₘ   |   Pmotor = Pnet/η

Bond originally used kWh per short ton. A short ton is exactly 0.90718474 metric tonnes. The calculator converts W and Wi together, and multiplies by throughput on the matching tonnage basis. Display presets are illustrative kWh/short ton values. Actual ore test results, crusher class and circuit correction factors determine design power.