Worked example · Rotary Drum

Under-filled sand dryer

A sand dryer is running below its intended volumetric feed after an upstream slowdown.

Live results

Sloped drum, bed section and fill band

Edit inputs
Sloped drum, bed section and fill band Four live readings and a schematic of the selected material-handling configuration. Full values follow the diagram. RESIDENCE4minDRUM FILL3.86%HOLDUP MASS3.42short tonsRIM SPEED109.96FPM DRUM ELEVATIONBED SECTION46 ft active length0.75 in/ft fall7 ft inside Ø31° repose Occupied cross-section3.86%Under-fill. Below the 8% reference.

Under-fill. Below the 8% reference.

All calculated values
Mean residence time
3.995min
Cross-sectional fill
3.859%
Solids holdup mass
3.416short tons
Peripheral speed
109.956FPM
Volumetric throughput
38yd³/h
Solids holdup volume
2.53yd³
Active drum volume
65.566yd³
Occupied cross-section
1.485ft²
Throughput at 8% fill
78.769yd³/h
Throughput at 15% fill
147.693yd³/h
Incline angle
3.576°

Inputs

Unit system
Operating inputs
ft
ft
in/ft
Downhill slope. The equation uses rise/run, converted from in/ft or degrees.
RPM
yd³/h
lb/ft³
°

Worked solution

Starting case in US units

  1. Convert 0.75 in/ft to rise/run. The 46 ft active length, 7 ft diameter and 5 RPM give 4 min residence time.
  2. Feed at 38 yd³/h accumulates 2.53 yd³ of solids. Divide by 65.57 yd³ drum volume to get 3.86% fill.
  3. At 100 lb/ft³ bulk density, holdup is 3.42 short tons. The reference fill band corresponds to 78.77 yd³/h through 147.69 yd³/h.

Try it. Increase feed until the fill is at least 8%. Mean residence time is unchanged in this simple correlation.

More worked examples

Open a different starting case

Equations and assumptions

Simplified Sullivan residence time

t = 0.19 L / (N D S)   |   S = tan α = (in/ft)/12

L and D may both be metres or both be feet. N is rpm, S is rise over horizontal run, and t is minutes. This handbook form uses a fixed 0.19 coefficient. The entered repose angle sets the drawn bed orientation. Material-specific residence time depends on repose, flights, dams, conveying action and gas flow.

Holdup, fill and rim speed

Vhold = Qᵥ t/60   |   Vdrum = πD²L/4
Fill = 100 Vhold/Vdrum   |   Mhold = ρ Vhold   |   v = πDN/60

Steady-state holdup uses Qᵥ in m³/h. Cross-sectional fill is an average for a uniform inside diameter. The 8–15% visual window is a preliminary loading reference and identifies under-fill and potential cascading overload. A computed fill above 100% signals an infeasible steady-state estimate.