Worked example · Slurry Pipeline

Coal slurry below the settling threshold

A low-flow coal slurry passes through a seven-inch line. The predicted mixture velocity is below the deposition reference.

Live results

Slurry pipe and deposition threshold

Edit inputs
Slurry pipe and deposition threshold Four live readings and a schematic of the selected material-handling configuration. Full values follow the diagram. SOLIDS VOL.20.9%SLURRY SG1.08LINE VELOCITY3.17ft/sCRITICAL VEL.4.07ft/s SLURRY PIPEVELOCITY VS PIPE IDLine flowID 7 ind50 0.04 inActualDepositionSmaller IDLarger ID Actual / deposition velocity77.86%Below the modeled threshold. Solids may settle.

Below the modeled threshold. Solids may settle.

All calculated values
Solids by volume Cv
20.898%
Mixture specific gravity
1.084
Actual line velocity
3.168ft/s
Critical velocity
4.069ft/s
Velocity above critical
-0.901ft/s
Settling velocity margin
-22.137%
Durand factor used
1.05
Flow at deposition threshold
488.036GPM
Solids mass flow
27.834TPH

Inputs

Unit system
Operating inputs
%
in
in
0 estimates FL from d50, pipe ID and Cv. Enter a measured or chart-derived factor when available.
GPM

Worked solution

Starting case in US units

  1. Combine solids and carrier specific gravities of 1.4 and 1 with 27% solids by mass. The mixture has 20.9% solids by volume and SG 1.08.
  2. Use the 7 in pipe ID and Fl = 1.05 to get critical velocity of 4.07 ft/s.
  3. Divide the flow of 380 GPM by the pipe area. Actual velocity is 3.17 ft/s and the modeled margin is -22.14%.

Try it. Use the threshold flow to compare a higher-flow case and observe where the velocity margin changes sign.

More worked examples

Open a different starting case

Equations and assumptions

Conservation of mass and volume

Sₘ = 1/[Cw/Ss + (1 − Cw)/SL]   |   Cv = Cw Sₘ/Ss

Cw and Cv are fractions on mass and volume bases. Ss is solids SG and SL is carrier SG, both relative to water. The mixture relation assumes additive phase volumes.

Durand velocity and margin

V = 4Q/(πD²)   |   Vₗ = Fₗ √[2gD(Ss/SL − 1)]
Margin = 100(V/Vₗ − 1)%

Use Q in m³/s and D in metres. With water, SL = 1 and the density term reduces to Ss − 1. A positive margin is relative to the model threshold. Higher velocity can increase wear. Verify the operating range using site solids, carrier properties and pump or pipe data.

Choosing the empirical factor

Fₗ estimate = 4 Cv^(1/5) (d50/D)^(1/6)

The estimate is available when the factor input is 0. It is an illustrative approximation for settling granular suspensions. A user-specified factor holds the deposition calculation fixed with respect to d50. Use test or vendor curves for broad gradation, non-Newtonian carriers, and high concentrations.

References