Worked example · Slurry Pipeline

Coarse sand sensitivity to pipe ID

A large-diameter transfer line carries a coarse sand slurry. Candidate pipe IDs are compared at equal volumetric flow.

Live results

Slurry pipe and deposition threshold

Edit inputs
Slurry pipe and deposition threshold Four live readings and a schematic of the selected material-handling configuration. Full values follow the diagram. SOLIDS VOL.18.78%SLURRY SG1.31LINE VELOCITY10.78ft/sCRITICAL VEL.14.01ft/s SLURRY PIPEVELOCITY VS PIPE IDLine flowID 12 ind50 0.09 inActualDepositionSmaller IDLarger ID Actual / deposition velocity76.92%Below the modeled threshold. Solids may settle.

Below the modeled threshold. Solids may settle.

All calculated values
Solids by volume Cv
18.784%
Mixture specific gravity
1.31
Actual line velocity
10.78ft/s
Critical velocity
14.014ft/s
Velocity above critical
-3.234ft/s
Settling velocity margin
-23.076%
Durand factor used
1.36
Flow at deposition threshold
4,939.939GPM
Solids mass flow
473.572TPH

Inputs

Unit system
Operating inputs
%
in
in
0 estimates FL from d50, pipe ID and Cv. Enter a measured or chart-derived factor when available.
GPM

Worked solution

Starting case in US units

  1. Combine solids and carrier specific gravities of 2.65 and 1 with 38% solids by mass. The mixture has 18.78% solids by volume and SG 1.31.
  2. Use the 12 in pipe ID and Fl = 1.36 to get critical velocity of 14.01 ft/s.
  3. Divide the flow of 3800 GPM by the pipe area. Actual velocity is 10.78 ft/s and the modeled margin is -23.08%.

Try it. Reduce ID from 12 to 10 inches. Actual velocity rises as the calculated critical velocity falls.

More worked examples

Open a different starting case

Equations and assumptions

Conservation of mass and volume

Sₘ = 1/[Cw/Ss + (1 − Cw)/SL]   |   Cv = Cw Sₘ/Ss

Cw and Cv are fractions on mass and volume bases. Ss is solids SG and SL is carrier SG, both relative to water. The mixture relation assumes additive phase volumes.

Durand velocity and margin

V = 4Q/(πD²)   |   Vₗ = Fₗ √[2gD(Ss/SL − 1)]
Margin = 100(V/Vₗ − 1)%

Use Q in m³/s and D in metres. With water, SL = 1 and the density term reduces to Ss − 1. A positive margin is relative to the model threshold. Higher velocity can increase wear. Verify the operating range using site solids, carrier properties and pump or pipe data.

Choosing the empirical factor

Fₗ estimate = 4 Cv^(1/5) (d50/D)^(1/6)

The estimate is available when the factor input is 0. It is an illustrative approximation for settling granular suspensions. A user-specified factor holds the deposition calculation fixed with respect to d50. Use test or vendor curves for broad gradation, non-Newtonian carriers, and high concentrations.