Worked example · Slurry Pipeline

Dense iron ore in a 10-inch pipe

An iron-ore line carries more than half its slurry mass as solids. Dense solids occupy a smaller fraction of volume.

Live results

Slurry pipe and deposition threshold

Edit inputs
Slurry pipe and deposition threshold Four live readings and a schematic of the selected material-handling configuration. Full values follow the diagram. SOLIDS VOL.19.96%SLURRY SG1.78LINE VELOCITY16.14ft/sCRITICAL VEL.17.93ft/s SLURRY PIPEVELOCITY VS PIPE IDLine flowID 10 ind50 0.02 inActualDepositionSmaller IDLarger ID Actual / deposition velocity89.98%Below the modeled threshold. Solids may settle.

Below the modeled threshold. Solids may settle.

All calculated values
Solids by volume Cv
19.964%
Mixture specific gravity
1.779
Actual line velocity
16.136ft/s
Critical velocity
17.932ft/s
Velocity above critical
-1.796ft/s
Settling velocity margin
-10.018%
Durand factor used
1.24
Flow at deposition threshold
4,389.769GPM
Solids mass flow
967.393TPH

Inputs

Unit system
Operating inputs
%
in
in
0 estimates FL from d50, pipe ID and Cv. Enter a measured or chart-derived factor when available.
GPM

Worked solution

Starting case in US units

  1. Combine solids and carrier specific gravities of 4.9 and 1 with 55% solids by mass. The mixture has 19.96% solids by volume and SG 1.78.
  2. Use the 10 in pipe ID and Fl = 1.24 to get critical velocity of 17.93 ft/s.
  3. Divide the flow of 3950 GPM by the pipe area. Actual velocity is 16.14 ft/s and the modeled margin is -10.02%.

Try it. Compare Cv to the 55% Cw, then reduce flow to investigate how the velocity margin changes.

More worked examples

Open a different starting case

Equations and assumptions

Conservation of mass and volume

Sₘ = 1/[Cw/Ss + (1 − Cw)/SL]   |   Cv = Cw Sₘ/Ss

Cw and Cv are fractions on mass and volume bases. Ss is solids SG and SL is carrier SG, both relative to water. The mixture relation assumes additive phase volumes.

Durand velocity and margin

V = 4Q/(πD²)   |   Vₗ = Fₗ √[2gD(Ss/SL − 1)]
Margin = 100(V/Vₗ − 1)%

Use Q in m³/s and D in metres. With water, SL = 1 and the density term reduces to Ss − 1. A positive margin is relative to the model threshold. Higher velocity can increase wear. Verify the operating range using site solids, carrier properties and pump or pipe data.

Choosing the empirical factor

Fₗ estimate = 4 Cv^(1/5) (d50/D)^(1/6)

The estimate is available when the factor input is 0. It is an illustrative approximation for settling granular suspensions. A user-specified factor holds the deposition calculation fixed with respect to d50. Use test or vendor curves for broad gradation, non-Newtonian carriers, and high concentrations.

References