Fire sprinkler inspection route billing rate
Model a two-technician inspection route with annual certification costs, paid vehicle time and a high share of invoiced maintenance hours.
Worksheet inputs
Results
Field operations- True loaded cost per paid hour
- $58.18/hr
- Break-even billable rate
- $81.04/hr
- Actual billable hours per tech
- 1,646.4 hr
- Direct cost per billable hour
- $69.27/hr
- Overhead per billable hour
- $11.78/hr
- Annual gross profit per tech
- $34,212.36
- Annual gross profit for crew
- $68,424.72
- Annual gross margin per tech or crew
- 23.08%
- Annual net profit for crew
- $29,650.71
- Enter the share of paid time you actually invoice after travel, holidays, rain days, unbilled callbacks and warranty work. Annual gross profit is revenue less direct labor cost. Annual net profit also deducts company overhead.
How to use this example
Travel is concentrated into dense routes, but inspection reporting still uses paid time. Include whether the reporting hours are covered by the billed service.
Model a second utilization rate for remote sites. The same wage and benefit package can support a substantially different hourly charge.
Open calculator defaultsFrequently asked questions
Do inspection certifications belong in the hourly rate?
Budget recurring technician-level certification and tool costs in annual support. Place company-wide licensing in overhead if that is how the cost is recovered.
How do multi-site customers change the inspection rate?
Grouped visits can reduce paid drive time between sites. Use observed paid hours and billed hours for that route before allowing a volume discount.
Fire sprinkler inspection route billing rate
- True loaded cost per paid hour
- $58.18/hr
- Break-even billable rate
- $81.04/hr
- Actual billable hours per tech
- 1,646.4 hr
- Direct cost per billable hour
- $69.27/hr
- Overhead per billable hour
- $11.78/hr
- Annual gross profit per tech
- $34,212.36
- Annual gross profit for crew
- $68,424.72
- Annual gross margin per tech or crew
- 23.08%
- Annual net profit for crew
- $29,650.71
Worksheet inputs
- Base hourly wage per tech
- 42 $
- Payroll taxes
- 9 %
- Workers’ compensation
- 3 %
- General liability on wages
- 4 %
- Technicians in crew
- 2
- Benefits
- 9500 $
- Truck and fuel
- 6200 $
- Tools and uniforms
- 2850 $
- Paid hours per tech per year
- 1960 hr
- Actual billable utilization
- 84 %
- Company overhead on billable cost
- 17 %
- Target net profit margin
- 10 %
Use these deterministic job-costing and financial-planning models with your own rates. Legal contract language, AIA forms advice, tax advice, and binding bid guarantees are outside their scope. Confirm local retainage statutes, prevailing-wage rules, bond and insurance rates, and signed subcontract terms before bidding.