Annual Construction Overhead Recovery (Single-Rate vs. Dual-Rate MORS) Calculator

Price materials handling and field labor separately while recovering the same annual fixed costs. Compare both recovery plans side by side.

Worksheet inputs

Annual budget
$
Include office, admin, fleet, marketing and insurance that sit outside direct job costs.
$
$
hr
Recovery and profit
%
The field labor base absorbs the remaining fixed overhead.
%

Results

Estimating
Break-even annual revenue$2,200,000.00
Monthly overhead burn
$25,833.33
Single rate on direct costs
16.4%
Dual rate on materials and subs
7%
Dual rate on field labor
34.77%
Dual recovery per field hour
$17.38/hr
Materials and subs recovery
$87,500.00
Field labor recovery
$222,500.00
Annual sales for net profit target
$2,444,444.44
Annual overhead allocated by pricing method
Annual overhead allocated by pricing methodSingle rate. Materials & subs $205,026.46. Field labor $104,973.54. Dual rate. Materials & subs $87,500.00. Field labor $222,500.00Single rate$310KDual rate$310KMaterials & subsField labor
  • The materials and field-labor allocations recover the same annual overhead as the single rate. Break-even revenue adds total direct costs and fixed overhead.

Frequently asked questions

What is dual-rate MORS pricing?

It allocates company overhead across more than one cost base. This model puts a handling share on materials and subcontractors and recovers the balance through field labor.

What happens if my materials handling charge covers all overhead?

Materials recovery stops at the fixed overhead budget, and field labor recovery drops to zero. A higher materials markup would generate contribution beyond the modeled overhead target.

How do I apply the field-hour figure to an estimate?

Multiply the budgeted overhead recovery per field hour by estimated field hours. Use the same definition of field hours as the annual budget and add the materials and subcontractor recovery separately.