Annual Construction Overhead Recovery (Single-Rate vs. Dual-Rate MORS) Calculator
Price materials handling and field labor separately while recovering the same annual fixed costs. Compare both recovery plans side by side.
Worksheet inputs
Results
Estimating- Monthly overhead burn
- $25,833.33
- Single rate on direct costs
- 16.4%
- Dual rate on materials and subs
- 7%
- Dual rate on field labor
- 34.77%
- Dual recovery per field hour
- $17.38/hr
- Materials and subs recovery
- $87,500.00
- Field labor recovery
- $222,500.00
- Annual sales for net profit target
- $2,444,444.44
- The materials and field-labor allocations recover the same annual overhead as the single rate. Break-even revenue adds total direct costs and fixed overhead.
Frequently asked questions
What is dual-rate MORS pricing?
It allocates company overhead across more than one cost base. This model puts a handling share on materials and subcontractors and recovers the balance through field labor.
What happens if my materials handling charge covers all overhead?
Materials recovery stops at the fixed overhead budget, and field labor recovery drops to zero. A higher materials markup would generate contribution beyond the modeled overhead target.
How do I apply the field-hour figure to an estimate?
Multiply the budgeted overhead recovery per field hour by estimated field hours. Use the same definition of field hours as the annual budget and add the materials and subcontractor recovery separately.
Annual Construction Overhead Recovery (Single-Rate vs. Dual-Rate MORS) Calculator
- Monthly overhead burn
- $25,833.33
- Single rate on direct costs
- 16.4%
- Dual rate on materials and subs
- 7%
- Dual rate on field labor
- 34.77%
- Dual recovery per field hour
- $17.38/hr
- Materials and subs recovery
- $87,500.00
- Field labor recovery
- $222,500.00
- Annual sales for net profit target
- $2,444,444.44
Worksheet inputs
- Fixed company overhead
- 310000 $
- Direct materials and subs
- 1250000 $
- Direct field labor
- 640000 $
- Projected field labor hours
- 12800 hr
- Materials and subs handling markup
- 7 %
- Target net profit margin
- 10 %
Use these deterministic job-costing and financial-planning models with your own rates. Legal contract language, AIA forms advice, tax advice, and binding bid guarantees are outside their scope. Confirm local retainage statutes, prevailing-wage rules, bond and insurance rates, and signed subcontract terms before bidding.