HVAC shop overhead on labor and equipment
Allocate fixed HVAC company overhead between equipment and subcontract handling and 16,000 projected field labor hours.
Worksheet inputs
Results
Estimating- Monthly overhead burn
- $30,000.00
- Single rate on direct costs
- 20%
- Dual rate on materials and subs
- 6%
- Dual rate on field labor
- 37.5%
- Dual recovery per field hour
- $18.75/hr
- Materials and subs recovery
- $60,000.00
- Field labor recovery
- $300,000.00
- Annual sales for net profit target
- $2,454,545.45
- The materials and field-labor allocations recover the same annual overhead as the single rate. Break-even revenue adds total direct costs and fixed overhead.
How to use this example
The shop carries dispatch, office salaries, fleet and working space. Direct equipment and ductwork follow individual installation jobs.
A 6% handling markup on one million of materials and subs recovers 60,000. Field labor carries the remaining 300,000 across the projected year.
Open calculator defaultsFrequently asked questions
Should replacement compressors absorb the same rate as field labor?
A dual-rate estimate can assign equipment a lower handling cost and use field labor to cover most fixed overhead. Inventory risk and payment terms may still affect the quoted price.
What should I update if technician vacancies cut field hours?
Lower the projected field hours and revise the direct labor budget. Recalculate how much fixed overhead each remaining field hour needs to recover.
HVAC shop overhead on labor and equipment
- Monthly overhead burn
- $30,000.00
- Single rate on direct costs
- 20%
- Dual rate on materials and subs
- 6%
- Dual rate on field labor
- 37.5%
- Dual recovery per field hour
- $18.75/hr
- Materials and subs recovery
- $60,000.00
- Field labor recovery
- $300,000.00
- Annual sales for net profit target
- $2,454,545.45
Worksheet inputs
- Fixed company overhead
- 360000 $
- Direct materials and subs
- 1000000 $
- Direct field labor
- 800000 $
- Projected field labor hours
- 16000 hr
- Materials and subs handling markup
- 6 %
- Target net profit margin
- 12 %
Use these deterministic job-costing and financial-planning models with your own rates. Legal contract language, AIA forms advice, tax advice, and binding bid guarantees are outside their scope. Confirm local retainage statutes, prevailing-wage rules, bond and insurance rates, and signed subcontract terms before bidding.