Subcontract-heavy general contractor overhead

Compare blended and dual rates for a general contractor with a large purchased-trade budget and a smaller direct payroll base.

Worksheet inputs

Annual budget
$
Include office, admin, fleet, marketing and insurance that sit outside direct job costs.
$
$
hr
Recovery and profit
%
The field labor base absorbs the remaining fixed overhead.
%

Results

Estimating
Break-even annual revenue$4,960,000.00
Monthly overhead burn
$51,666.67
Single rate on direct costs
14.29%
Dual rate on materials and subs
5%
Dual rate on field labor
37.5%
Dual recovery per field hour
$18.75/hr
Materials and subs recovery
$155,000.00
Field labor recovery
$465,000.00
Annual sales for net profit target
$5,391,304.35
Annual overhead allocated by pricing method
Annual overhead allocated by pricing methodSingle rate. Materials & subs $442,857.14. Field labor $177,142.86. Dual rate. Materials & subs $155,000.00. Field labor $465,000.00Single rate$620KDual rate$620KMaterials & subsField labor
  • The materials and field-labor allocations recover the same annual overhead as the single rate. Break-even revenue adds total direct costs and fixed overhead.

How to use this example

The pass-through base includes many complete trade packages. Small self-performed items and supervision booked directly to project labor make up the field base.

A low subcontract handling rate shifts recovery onto the smaller labor budget. Run a mix scenario for bids with unusually few self-performed hours.

Open calculator defaults

Frequently asked questions

What if a bid has almost no labor that I self-perform?

Test the recovery that the handling markup alone produces. Consider whether the allowed general conditions and fee recover the overhead needed for that work mix.

How do I count superintendent time booked to jobs?

Use the direct labor budget for time explicitly charged to projects. Include unallocated company supervision in fixed overhead and avoid double counting.