Landscape hardscape gross margin bid
Set a gross margin target for a hardscape project with stone pavers, compacted base, rented machinery and a separate excavation quote.
Worksheet inputs
Results
Estimating- Direct job costs
- C$36,000.00
- Base bid
- C$50,000.00
- Cost markup
- 38.89%
- Gross margin
- 28%
- Overhead recovered
- C$7,000.00
- Net profit
- C$7,000.00
- Net profit margin
- 14%
- Base bid for desired profit
- C$48,000.00
- Bond pass-through
- C$0.00
- Sales tax pass-through
- C$0.00
- Shortfall to desired profit
- C$0.00
- Gross margin and net profit use the base bid as the denominator. The bond applies to the base bid and sales tax applies to its entered taxable share. Both charges pass through outside modeled profit.
Markup and margin on the same costs
| Pricing rule | Base bid | Markup | Gross margin |
|---|---|---|---|
| 25% cost markup | C$45,000.00 | 25% | 20% |
| 25% gross margin | C$48,000.00 | 33.33% | 25% |
| Your pricing rule | C$50,000.00 | 38.89% | 28% |
How to use this example
Include base aggregate, paver waste and deliveries in the materials quote. Keep trenching and exported spoil in the excavation quote if that supplier provides both.
Update the field labor cost if access requires wheelbarrows instead of a loader. The example assumes the materials quote and wage budget use the same currency.
Open calculator defaultsFrequently asked questions
How do I carry an alternate paver pattern?
Revise the waste factor and installation hours together. Pattern changes can affect cutting, layout and edge work even when the area is unchanged.
Is spoil handling part of company overhead?
When disposal follows this specific job, carry it as a direct line. The office cost of estimating and managing the company is a separate overhead budget.
Landscape hardscape gross margin bid
- Direct job costs
- C$36,000.00
- Base bid
- C$50,000.00
- Cost markup
- 38.89%
- Gross margin
- 28%
- Overhead recovered
- C$7,000.00
- Net profit
- C$7,000.00
- Net profit margin
- 14%
- Base bid for desired profit
- C$48,000.00
- Bond pass-through
- C$0.00
- Sales tax pass-through
- C$0.00
- Shortfall to desired profit
- C$0.00
Worksheet inputs
- Materials
- 17700 C$
- Field labor
- 9600 C$
- Subcontractors
- 4800 C$
- Equipment and permits
- 3900 C$
- Solve bid from
- Target gross margin
- Target gross margin
- 28 %
- Overhead share of base bid
- 14 %
- Desired net profit margin
- 11 %
- Bond on base bid
- 0 %
- Sales tax rate
- 0 %
- Taxable share of base bid
- 100 %
Use these deterministic job-costing and financial-planning models with your own rates. Legal contract language, AIA forms advice, tax advice, and binding bid guarantees are outside their scope. Confirm local retainage statutes, prevailing-wage rules, bond and insurance rates, and signed subcontract terms before bidding.