Worked example · Reaction engineering
Low-conversion CSTR penalty
Compare ideal reactor volumes, space time and equal-tank conversion for zero-, first- or second-order kinetics.
For a second-order polishing duty, compare reactor volumes at just 3% conversion.
- CSTR volume
- 0.3673 m³
- PFR volume
- 0.3563 m³
- CSTR / PFR
- 1.031
- Cascade X
- 2.957 %
Levenspiel volume comparison
Live schematicThe conversion check holds total cascade volume at the PFR volume. Use the separate cascade size to meet the target.
Calculation inputs
- Reaction order
- Second order
- Reference rate constant kref
- 0.5 m³/(kmol·h)
- Reference temperature
- 25 °C
- Operating temperature
- 40 °C
- Activation energy Ea
- 0 kJ/mol
- Inlet volume flow v₀
- 7.2 m³/h
- Inlet concentration CA₀
- 1.25 kmol/m³
- Target conversion X
- 3 %
- Equal CSTRs in series
- 2
Worked solution
- Evaluate the rate at temperature
The Arrhenius correction gives k = 0.5 m³/(kmol·h). At X = 3 %, CA = 1.212 kmol/m³.
- Compare the Levenspiel areas
The outlet-rate rectangle gives 0.3673 m³. Integrating through the concentration change gives 0.3563 m³. The single-tank penalty is 1.031 times.
- Check the cascade
2 equal tanks at PFR total volume reach 2.957 %. At the target, the cascade requires 0.3618 m³ total.
At low conversion the rate changes little along the reactor, so the volume penalty is small. The derivation uses SI units.
| Operating rate constant | 0.5 m³/(kmol·h) |
|---|---|
| Total cascade volume at target | 0.3618 m³ |
| Volume per equal tank | 0.1809 m³ |
| CSTR space time | 0.05101 h |
| PFR space time | 0.04948 h |
| Cascade space time at target | 0.05024 h |
| Outlet concentration CA | 1.212 kmol/m³ |
| PFR-sized cascade shortfall | 0.04336 pp |
Calculation inputs
Live updates
Equations and assumptions
- Power-law kinetics
- −rA = k · CA^n
- Temperature adjustment
- k = kref exp[(Ea/R)(1/Tref − 1/T)]
- Single CSTR
- VCSTR = FA₀X / [k CA₀^n (1 − X)^n]
- Plug flow
- VPFR = ∫₀ˣ FA₀ / (−rA) dX
The ideal model is steady state, isothermal and constant density. It assumes one irreversible power-law reaction and no change in volumetric flow. Enter a rate constant with units for the selected order.
The cascade check divides the PFR volume among equal CSTRs. A separate cascade sizing step computes the volume needed at the target. For second order each tank solves Ci + kτtank Ci² = Ci−1 using a cancellation-safe positive root.