16-Foot Baseboard for an 18 × 24 Family Room

Estimate baseboard sticks with two wider openings, extra measured runs, two caulk beads, and two brad rows.

Project inputs

Trim runs
ft
ft
ft
ft
ft
Stock and corners
%
Caulk and brads
ft
in
View shopping list

Shopping list

6 sticksBaseboard 16 ft each

  • Caulk55 ft of bead per tube
    4 tubes
  • Brad nails500 brads each
    1 box
Net trim run
83 ft
Buy length with waste
91.3 ft
Inside / outside miter cuts
8 / 0
Brads needed
126

Baseboard perimeter Baseboard perimeter 24 ft 18 ft 83 ft installed · 8 miter cuts
Schematic layout

Worked takeoff

  1. Measure installed runs

    84 ft perimeter − 7 ft interruptions + 6 ft extra runs = 83 ft.

  2. Include miter and cut waste

    83 ft × 1.1 = 91.3 ft. Divide by 16 ft stock and round up to 6 sticks.

  3. Count cut ends

    Two ends per corner give 8 inside and 0 outside miter cuts.

  4. Size consumables from the installed length

    166 ft of bead gives 4 caulk tubes. Brads spaced at 16 in in 2 row(s) give 126 brads or 1 boxes.

Check before you buy

Measure the casing gaps and verify the caulk label’s yield for the planned bead size. A 24 ft wall also needs a stock joint with 16 ft lengths.

Measure each uninterrupted run and plan stock cuts, especially for long walls or one-piece casing legs. Verify the corner angles, bead size, and fastening requirements against the molding instructions.

Frequently asked questions

Why does the caulk takeoff count 166 feet on an 83-foot installation?

The example uses two beads along each installed run. Those bead lengths are added before dividing by tube yield.

Does a second brad row require twice as many fasteners?

The estimator doubles the count from one spaced row. Box rounding depends on the number of brads in the package.