A/B sample size & runtime

Onboarding Test With an Absolute MDE

An onboarding team wants to detect a 4 percentage-point change from 42% activation at 90% power on 720 eligible users per day.

Fixed-horizon Z-tests assume independent observations and a decision rule set in advance. Repeated peeking or stopping when p crosses a cutoff needs a sequential design or an appropriate adjustment.

See the equations

Scenario inputs

Change the inputs to recalculate the experiment.

%
pp

Readout

Local calculation

Sample per arm
3,235
Total eligible visitors
6,470
Runtime
9 days

Runtime assumes equal allocation and a steady flow of eligible visitors across all arms.

Sample size by detectable effect

Sample size sensitivityEstimated visitors per arm fall as the minimum detectable effect rises. The dot marks the entered effect.Absolute MDE · pp06.95K13.91K23.556.58
Every point uses the same traffic, power and comparison settings. The marked point is your chosen MDE.

All results

Runtime in weeks
1.29 weeks
Variant conversion at MDE
46%
MDE in percentage points
4 pp
MDE relative to baseline
9.524%
Alpha per comparison
5%
Variant vs Control comparisons
1

MDE sensitivity

Absolute MDEPer armTotalDays
2 pp12,87525,75036
3 pp5,73711,47416
4 pp3,2356,4709
6 pp1,4432,8865
8 pp8141,6283

Frequently asked questions

How does a 4 pp onboarding goal translate into relative lift?

A move from 42% to 46% is about a 9.52% relative increase over the 42% baseline.

What if activation takes seven days to measure?

Allow the last recruited cohort a full seven days of follow-up after accrual ends.