A/B sample size & runtime

Trial Upgrade Test at 90% Power

A product team plans around a 10% relative lift on a 17.5% trial-to-paid rate with 90% power and 1% significance.

Fixed-horizon Z-tests assume independent observations and a decision rule set in advance. Repeated peeking or stopping when p crosses a cutoff needs a sequential design or an appropriate adjustment.

See the equations

Scenario inputs

Change the inputs to recalculate the experiment.

%
%

Readout

Local calculation

Sample per arm
14,572
Total eligible visitors
29,144
Runtime
62 days

Runtime assumes equal allocation and a steady flow of eligible visitors across all arms.

Sample size by detectable effect

Sample size sensitivityEstimated visitors per arm fall as the minimum detectable effect rises. The dot marks the entered effect.Relative MDE030.89K61.79K5%8.75%12.5%16.25%20%
Every point uses the same traffic, power and comparison settings. The marked point is your chosen MDE.

All results

Runtime in weeks
8.86 weeks
Variant conversion at MDE
19.25%
MDE in percentage points
1.75 pp
MDE relative to baseline
10%
Alpha per comparison
1%
Variant vs Control comparisons
1

MDE sensitivity

Relative MDEPer armTotalDays
5%57,212114,424241
7.5%25,66851,336109
10%14,57229,14462
15%6,59413,18828
20%3,7747,54816

Frequently asked questions

Why set high power for a trial upgrade experiment?

A team may want a smaller risk of missing a worthwhile upgrade lift before it makes a costly product decision.

Does the trial-upgrade duration include the free trial itself?

It estimates intake time from daily eligible visitors. Add the time needed for upgrades to mature after the final assignment.