Banquet profit covers the room-rate floor

A large on-property event brings substantial incremental banquet profit. Most of the group block falls on quiet dates, and displaced transient nights are limited.

Expected group pickup
81
Net displacement gain
$16,967.00
Minimum group ADR
$0.00

Scenario inputs

Denomination only. Use one currency for every amount.
Group room block
USD
%
USD
Incremental ancillary profit
USD
Enter incremental profit after variable costs.
USD
Displaced transient demand
Use the nights you expect to lose after accounting for released rooms.
USD
USD

Results

Group and transient contribution

Group includes room contribution and ancillary profit. Transient shows the contribution displaced by accepting the group.

Group and displaced transient contribution USDGroup rooms · $6,723.00Group rooms6.7KAncillary profit · $13,700.00Ancillary profit13.7KGroup total · $20,423.00Group total20.4KTransient · $3,456.00Transient3.5KNet gain · $16,967.00Net gain17K

Select a chart mark to read its value.

Expected washed room nights
9
Group rooms revenue
$8,829.00
Group room contribution
$6,723.00
Ancillary profit
$13,700.00
Total group contribution
$20,423.00
Forgone transient contribution
$3,456.00
Algebraic parity ADR
-$100.47

These hospitality planning estimates model user-entered property and USALI-style parameters for planning only. They are not financial or legal advice.

Worked calculation

Why does the banquet case show an algebraic floor below zero?

The forecast ancillary profit exceeds the 3,456 in displaced room contribution and the 2,106 cost of servicing the group rooms. The minimum quoted rate is floored at zero.

Formulas & conventions

Expected pickup
Group pickup = contracted room nights × (1 − wash %). Expected room nights may be fractional.
Contribution comparison
Group contribution = pickup × (group ADR − group CPOR) + banquet profit + parking profit. Forgone transient contribution = displaced room nights × (transient ADR − transient CPOR). Net gain is the difference.
Minimum acceptable rate
Algebraic parity ADR = group CPOR + (forgone transient contribution − ancillary profit) ÷ pickup. The minimum quoted rate is the greater of zero and that parity ADR.

Enter segment-specific variable room costs and ancillary profit on an incremental basis. Use the same rooms revenue basis for group and transient. Build the displaced nights from a date-by-date forecast that accounts for the release cutoff and stranded room nights.

Read the methodology and references

More worked examples

  • Conference block at exact parity

    A 100-night conference block expects 20% wash. Group and transient costs differ, and the block needs to support itself from room contribution alone.

  • Wedding block with uneven pickup

    A wedding block expects 27.5% wash on 123 contracted nights. The planner includes incremental banquet and parking profit after their related expenses.

  • Shoulder-night company retreat

    A hotel can absorb an 80-night retreat on need dates with no forecast transient displacement. The group brings modest ancillary profit and a discount rate.

  • Late group release cutoff

    A late cutoff holds rooms away from the transient market. The hotel expects to turn away 123 transient nights although only 104 group nights will materialize.

  • Fully washed block with lost demand

    An event releases all its rooms after transient demand has passed. The hotel models forgone transient nights without group room pickup or event profit.