Weekend rate hike with an occupancy cushion

A hotel at 85% occupancy and a 200 ADR considers a 10% hike. Each additional sold night incurs 40 in variable room costs.

Minimum occupancy
75.56%
Extra room nights required
0
Proposed ADR
$220.00

Scenario inputs

Denomination only. Use one currency for every amount.
Current room economics
USD
%
USD
Proposed rate and demand
%
Enter a negative percentage for a rate cut.
%

Results

Same-contribution rate curve

Every point on the curve earns the baseline room contribution at a different occupancy. The proposed rate and occupancy are marked separately.

ADR and occupancy at constant room contribution ADR (USD)700350021.9461100Baseline · 85% at $200.00 Breakeven · 75.56% at $220.00 Proposed · 78% at $220.00 Occupancy (%)

Select a chart mark to read its value.

Baseline occupied room nights
850
Baseline contribution per room
$160.00
Baseline room contribution
$136,000.00
Proposed contribution per room
$180.00
Minimum whole room nights
756
Occupancy ceiling at a loss
—
Forecast room contribution
$140,400.00
Forecast contribution change
$4,400.00
Implied demand elasticity
-0.82

These hospitality planning estimates model user-entered property and USALI-style parameters for planning only. They are not financial or legal advice.

Worked calculation

How far can occupancy fall after the weekend hike?

The original contribution is 136,000 and the new margin is 180 per night. About 75.56% occupancy preserves contribution, so the 78% forecast clears it.

Formulas & conventions

Contribution
Occupied nights = available nights × occupancy. Room contribution = occupied nights × (ADR − variable CPOR). Proposed ADR = ADR × (1 + proposed ADR change).
Break-even volume
For positive baseline contribution and positive proposed unit margin, minimum room nights = baseline contribution ÷ proposed unit margin. Divide by available nights for occupancy. Round room nights up for a whole-room booking target.
Loss-making case
With a nonpositive baseline, zero occupancy meets the baseline. When the proposed unit margin is negative, occupancy must also stay at or below the baseline divided by the proposed unit margin and room supply.
Iso-contribution and elasticity
For a given positive occupancy, same-contribution ADR = CPOR + baseline contribution ÷ (supply × occupancy). Elasticity here is the relative forecast occupancy change divided by the relative ADR change.

CPOR is the variable servicing cost for an additional occupied room night. Use the same tax, distribution and room revenue basis in both rate scenarios. The elasticity estimate comes from your own occupancy forecast.

Read the methodology and references

More worked examples