Housekeeping Room-Attendant Staffing, MPA & Linen Par Calculator

Staff a housekeeping shift and size sheet and towel inventory for the rooms in service.

Attendants to schedule
7
Minutes per allocated room
27.23 min
Daily dry laundry
354.78 lb

Scenario inputs

Changing units converts the weights.
Rooms and cleaning standards
min
min
Productive shift and inspections
hr
Exclude breaks and time unavailable for cleaning.
Linen stock and laundry
lb
lb
%

Results

Shift workload & linen stock

Cleaning minutes and stock pieces use separate scales. Daily laundry uses the selected weight unit.

Housekeeping cleaning workload and linen par stock Cleaning workload · minutesCheckouts · 1,734 min Checkouts1.7KStayovers · 798 min Stayovers798Linen par stock · piecesSheets · 1,024 Sheets1KTowels · 2,048 Towels2KDaily laundry354.78 lb

Select a chart mark to read its value.

Rooms allocated to clean
93
Checkout cleaning minutes
1,734 min
Stayover cleaning minutes
798 min
Total cleaning minutes
2,532 min
Productive shift equivalents
6.25 FTE
Supervisors or inspectors
1
Sheets in par stock
1,024
Towels in par stock
2,048
Full linen set equivalents
65.7
Sheets to wash per day
131.4
Towels to wash per day
262.8

These hospitality planning estimates model user-entered property and USALI-style parameters for planning only. They are not financial or legal advice.

Formulas & conventions

Minutes and MPA
Total minutes = checkouts × minutes per checkout + stayovers × minutes per stayover. MPA = total minutes ÷ (checkouts + stayovers).
Coverage
Productive shift equivalents = total minutes ÷ (productive hours × 60). Attendants = shift equivalents rounded up. Supervisors = attendants ÷ attendants per supervisor, rounded up.
Inventory
Sheets or towels in par stock = rooms in service × pieces per room set × par level. One par represents enough pieces to outfit every room once.
Laundry
Full set equivalents = checkouts + stayovers × full-change rate. Multiply by sheets and towels per set and their dry piece weights. The international pound is exactly 0.45359237 kg.

Use one housekeeping productivity standard per room type and one planned service per physical room that day. Shift equivalents measure the modeled day’s workload. Weekly schedules also need days off, leave and other duties.

Read the methodology and references

Worked examples

  • Airport hotel Sunday turnover

    A 160-room airport property has 82 checkouts and 37 stayovers to clean. The supervisor staffs against productive shift hours after briefings and breaks.

  • Resort changeover day

    A resort has 116 checkouts on changeover day. It budgets long checkout cleans and a five-par stock for rooms with larger towel sets.

  • Extended-stay midweek housekeeping

    An extended-stay hotel has many stayovers and few checkouts. Only 20% of serviced stayovers receive a complete change of towels and sheets.

  • Contract laundry weight in kilograms

    A city property sends laundry to a vendor that quotes dry kilograms. Its housekeeping team logs 70 checkouts, 40 stayovers and a full linen change for half of the stayovers.

  • Closed wing and three-par linen

    A property temporarily has 64 rooms in service. Laundry circulates through its smaller active stock while staff complete 15 checkouts and 18 stayover services.

  • Empty housekeeping assignment

    An open hotel has no scheduled checkout or stayover service for this shift. It still maintains par stock across its 72 rooms.

Questions & answers

Does MPA mean minutes per occupied room?

MPA measures minutes per room assigned for cleaning. Occupied rooms without a scheduled service do not enter the denominator.

Why does par use every room in service?

Par sizes circulation stock for the full room base across beds, storage and laundry. Daily laundry reflects the actual checkout and stayover workload.

Is the laundry estimate wet or dry weight?

Use dry piece weights and compare the result with equipment rated for dry textile load. Water retained in fabric adds weight.