Hotel operations
Housekeeping Room-Attendant Staffing, MPA & Linen Par Calculator
Staff a housekeeping shift and size sheet and towel inventory for the rooms in service.
- Attendants to schedule
- 7
- Minutes per allocated room
- 27.23 min
- Daily dry laundry
- 354.78 lb
Scenario inputs
Results
Shift workload & linen stock
Cleaning minutes and stock pieces use separate scales. Daily laundry uses the selected weight unit.
Select a chart mark to read its value.
- Rooms allocated to clean
- 93
- Checkout cleaning minutes
- 1,734 min
- Stayover cleaning minutes
- 798 min
- Total cleaning minutes
- 2,532 min
- Productive shift equivalents
- 6.25 FTE
- Supervisors or inspectors
- 1
- Sheets in par stock
- 1,024
- Towels in par stock
- 2,048
- Full linen set equivalents
- 65.7
- Sheets to wash per day
- 131.4
- Towels to wash per day
- 262.8
These hospitality planning estimates model user-entered property and USALI-style parameters for planning only. They are not financial or legal advice.
Formulas & conventions
- Minutes and MPA
- Total minutes = checkouts × minutes per checkout + stayovers × minutes per stayover. MPA = total minutes ÷ (checkouts + stayovers).
- Coverage
- Productive shift equivalents = total minutes ÷ (productive hours × 60). Attendants = shift equivalents rounded up. Supervisors = attendants ÷ attendants per supervisor, rounded up.
- Inventory
- Sheets or towels in par stock = rooms in service × pieces per room set × par level. One par represents enough pieces to outfit every room once.
- Laundry
- Full set equivalents = checkouts + stayovers × full-change rate. Multiply by sheets and towels per set and their dry piece weights. The international pound is exactly 0.45359237 kg.
Use one housekeeping productivity standard per room type and one planned service per physical room that day. Shift equivalents measure the modeled day’s workload. Weekly schedules also need days off, leave and other duties.
Read the methodology and referencesWorked examples
- Airport hotel Sunday turnover
A 160-room airport property has 82 checkouts and 37 stayovers to clean. The supervisor staffs against productive shift hours after briefings and breaks.
- Resort changeover day
A resort has 116 checkouts on changeover day. It budgets long checkout cleans and a five-par stock for rooms with larger towel sets.
- Extended-stay midweek housekeeping
An extended-stay hotel has many stayovers and few checkouts. Only 20% of serviced stayovers receive a complete change of towels and sheets.
- Contract laundry weight in kilograms
A city property sends laundry to a vendor that quotes dry kilograms. Its housekeeping team logs 70 checkouts, 40 stayovers and a full linen change for half of the stayovers.
- Closed wing and three-par linen
A property temporarily has 64 rooms in service. Laundry circulates through its smaller active stock while staff complete 15 checkouts and 18 stayover services.
- Empty housekeeping assignment
An open hotel has no scheduled checkout or stayover service for this shift. It still maintains par stock across its 72 rooms.
Questions & answers
Does MPA mean minutes per occupied room?
MPA measures minutes per room assigned for cleaning. Occupied rooms without a scheduled service do not enter the denominator.
Why does par use every room in service?
Par sizes circulation stock for the full room base across beds, storage and laundry. Daily laundry reflects the actual checkout and stayover workload.
Is the laundry estimate wet or dry weight?
Use dry piece weights and compare the result with equipment rated for dry textile load. Water retained in fabric adds weight.