Operations · Worked example
Hotel breakfast outlet prime cost
Estimate breakfast outlet results with allocated breakfast revenue, small beverage sales, and scheduled kitchen labor.
Worksheet inputs
- Food sales
- $41,000.00
- Beverage sales
- $5,000.00
- Beginning inventory
- $5,200.00
- Purchases
- $14,800.00
- Ending inventory
- $4,800.00
- Hourly wages
- $11,100.00
- Salaried wages
- $4,750.00
- Payroll tax and benefits %
- 22%
- Occupancy costs
- $4,300.00
- Other operating overhead
- $5,600.00
Planning estimate
Edit inputs ↑- Total prime cost
- 75.08%
- Net operating margin
- 3.4%
- Food and beverage COGS
- 33.04%
- Loaded labor
- 42.04%
Prime cost planning reference: 60–65% or lower, depending on concept.
- Total period sales
- $46,000.00
- Inventory COGS
- $15,200.00
- Loaded labor dollars
- $19,337.00
- Prime cost dollars
- $34,537.00
- Controllable profit
- $11,463.00
- Net operating profit
- $1,563.00
How to read this example
Use the breakfast outlet’s revenue allocation for included room packages and reconcile the figure with its ingredient and staffing footprint.
COGS = beginning inventory + purchases − ending inventory. Loaded labor = hourly and salary wages × (1 + burden rate). Prime cost = COGS + loaded labor.
Controllable profit is the amount left after prime cost in this worksheet. Net operating profit then deducts occupancy and other entered operating overhead. Use sales net of discounts and tax and keep the period consistent.
Open the main calculatorFrequently asked questions
How do included hotel breakfasts enter as sales?
Use the revenue allocation designated for the breakfast operation and apply the same method across periods.
Where does a shared hotel engineer’s labor go in this example?
Allocate shared labor or overhead by the outlet’s accounting policy. Include it once in the selected cost category.