Atlanta, Georgia, US · USD worked example

Atlanta DSCR with lease and market rent

A purchaser inherits a lease signed below the current comparable rent. The starting screen uses the lower figure and assumes the tenancy continues at closing.

Educational use only. Illustrative underwriting estimates from financial and mathematical models. They do not constitute personalized financial, legal, tax, appraisal, or mortgage lending advice.

Underwriting workbench

Edit any assumption to update the ledger.

Currency sets the denomination. Enter all amounts in that currency. Area units convert between square feet and square metres.

Debt service coverage ratio
1.11×
Maximum modeled loan
$216,668.36
Total PITIA / mo
$2,189.04
See chart & ledger

Assumptions

Property & proposed loan
$
%
%
Nominal annual rate.
yr
sq ft
Optional. Enter 0 to omit the per-area result.
Qualifying income
$
$
Use 0 if there is no active lease.
%
$
Operating costs beyond taxes, insurance, flood and HOA.
PITIA & target
$
$
$
$
×
%
An assumed ceiling for the qualifying-loan estimate.

Projected results

Debt service coverage ratio
1.11×
Maximum modeled loan
$216,668.36
Total PITIA / mo
$2,189.04

StandardModeled tier · target 1.25×

Coverage & monthly payment

USD
Coverage & monthly paymentCoverage 1.11×. Tier Standard. Monthly PITIA $2,189.04. Gross rent ÷ PITIA1.11×0×Target 1.25×1.75× scaleMonthly PITIA$2,189.04P&I $1,686.54Tax $304.17Insurance $143.33Flood $0.00HOA $55.00P&ITaxInsuranceFloodHOASelected monthly rent $2,430.00
The marker is the selected target. The PITIA bar always shows the monthly housing breakdown.

Rate × LTV coverage matrix

Highlighted cell is the current quote. Shaded cells meet the entered target. Figures use the selected coverage definition.

Rate / LTV65%70%75%80%85%
6%1.34×1.26×1.20×1.14×1.09×
6.5%1.28×1.22×1.15×1.10×1.05×
7%1.24×1.17×1.11×1.06×1.01×
7.5%1.19×1.13×1.07×1.02×0.97×
8%1.15×1.09×1.03×0.98×0.93×

Coverage & financing

Selected qualifying rent / mo
$2,430.00
Proposed loan
$253,500.00
Debt service coverage ratio
1.11×
Illustrative tier
Standard
Underwritten NOI / yr
$18,692.00
Principal & interest / yr
$20,238.50

PITIA breakdown

Principal & interest / mo
$1,686.54
Property tax / mo
$304.17
Property insurance / mo
$143.33
Flood insurance / mo
$0.00
Association dues / mo
$55.00
Total PITIA / mo
$2,189.04

Target loan size

Available principal & interest / mo
$1,441.50
Coverage-based principal limit
$216,668.36
LTV-based principal limit
$270,400.00
Maximum modeled loan
$216,668.36
Loan headroom / (shortfall)
-$36,831.64
Property value per area
$208.00 / sq ft

Starting scenario walkthrough

These figures come from the example preset. Edit the workbench to run a different case.

  • Selected qualifying rent / mo $2,430.00

    Qualifying rent follows the selected basis. Toggle to market rent to isolate how a different rent basis affects the same proposed payment.

  • Maximum modeled loan $216,668.36

    The solver first divides rent by target coverage, then takes out fixed housing charges before converting the available payment into principal.

How the calculator works

  • Gross-rent coverage

    DSCR = selected monthly rent ÷ (principal and interest + taxes + insurance + flood + HOA).

  • Operating coverage

    DSCR = annual NOI ÷ annual principal and interest. NOI includes vacancy and operating costs.

  • Principal limit

    In gross mode, the loan payment budget equals rent ÷ target DSCR, less non-debt PITIA. In NOI mode use monthly NOI ÷ target DSCR. Cap the resulting principal by the entered LTV ceiling.

Read the underwriting methodology

Frequently asked questions

Which Atlanta rent is used when Lower available rent is selected?

With an active nonzero lease, the calculator uses the smaller of the market and lease entries. The analysis should match the documents and rent policy for your actual quote.

Can this Atlanta worksheet model a new lease at market after closing?

Enter the new rent or switch the rent basis to market for a separate scenario. Keep the inherited lease as a baseline to see what the resetting assumption changes.

Related worked examples

Open the general calculator