Rotterdam renovation contingency and offer ceiling
An older flat carries an unusually wide works contingency. The investor wants the largest offer that keeps a specific euro profit after exit costs.
Educational use only. Illustrative underwriting estimates from financial and mathematical models. They do not constitute personalized financial, legal, tax, appraisal, or mortgage lending advice.
Underwriting workbench
Edit any assumption to update the ledger.
Currency sets the denomination. Enter all amounts in that currency. Area units convert between square feet and square metres.
Anyone with the link can read its assumptions. A local file link opens on the machine with that file.
The breakdown traces gross sale through resale charges, purchase, rehab and carrying costs.
Cost & sale ledger
Buyer closing costs
€13,412.00
Rehab with contingency
€50,264.00
Total carrying costs
€4,095.00
Bridge principal
€142,680.00
Total financing costs
€9,330.01
Total pre-sale cost
€323,101.01
Total selling costs
€11,282.00
Net sale proceeds
€356,718.00
Total cash invested
€180,421.01
Net flip profit
€33,616.99
Offer ceilings & returns
Classic 70% rule MAO
€216,400.00
Target-profit MAO
€240,903.75
Target-margin MAO
€242,986.55
Net margin on resale
9.14%
Cash-on-cash ROI
18.63%
Annualized cash ROI
34.03%
Resale value per area
€3,845.75 / m²
Starting scenario walkthrough
These figures come from the example preset. Edit the workbench to run a different case.
Rehab with contingency€50,264.00
Apply contingency to the base renovation estimate. The contingency belongs in both the forecast total cost and the backward offer calculation.
Target-profit MAO€240,903.75
With percentage buyer and bridge costs, each extra euro of offer costs more than one euro. The solver divides the available budget by that cost multiplier.
How the calculator works
Classic offer
70% rule MAO = 0.70 × ARV − base rehab.
Custom offer
Subtract target profit and fixed project costs from net sale proceeds, then divide by 1 plus buyer and bridge costs proportional to offer price.
Holding-period return
Cash-on-cash = net profit ÷ pre-sale cash committed. Annualized return = (1 + cash-on-cash as a decimal) raised to 12 ÷ hold months, minus 1.
Can some Rotterdam renovation funding be debt-financed?
The worksheet funds the initial offer by loan share and treats refurbishment as cash. If the finance arrangement differs, estimate the additional fees and interest in the relevant cost inputs.
Why do actual Rotterdam margin and cash return differ?
Profit margin divides profit by sale price. Cash return divides it by the modeled upfront investor commitment, which reflects the bridge loan.
Rotterdam renovation contingency and offer ceiling
Rotterdam, Netherlands · worked example
EUR · m²
Net flip profit
€33,616.99
Target-profit MAO
€240,903.75
Cash-on-cash ROI
18.63%
Assumptions
Purchase offer
€246,000.00
Resale price / ARV
€368,000.00
Base rehab budget
€41,200.00
Rehab contingency
22 %
Fixed buyer closing costs
€8,000.00
Percentage buyer costs
2.2 %
Property floor area
95.6901312 m²
Months until sale
7 mo
Monthly carrying costs
€585.00
Bridge draw (% of offer)
58 %
Bridge interest rate
7.9 %
Bridge origination points
1.3 %
Fixed lender fees
€900.00
Selling agent commission
1.6 %
Seller concessions
0.8 %
Fixed seller closing costs
€2,450.00
Target net profit
€39,000.00
Target profit margin
10 %
Calculated results
Buyer closing costs
€13,412.00
Rehab with contingency
€50,264.00
Total carrying costs
€4,095.00
Bridge principal
€142,680.00
Total financing costs
€9,330.01
Total pre-sale cost
€323,101.01
Total selling costs
€11,282.00
Net sale proceeds
€356,718.00
Total cash invested
€180,421.01
Net flip profit
€33,616.99
Classic 70% rule MAO
€216,400.00
Target-profit MAO
€240,903.75
Target-margin MAO
€242,986.55
Net margin on resale
9.14%
Cash-on-cash ROI
18.63%
Annualized cash ROI
34.03%
Resale value per area
€3,845.75 / m²
Illustrative underwriting estimates from financial and mathematical models. They do not constitute personalized financial, legal, tax, appraisal, or mortgage lending advice.