Worked example
A river inlay with a 100:45 resin ratio
Translate a measured inlay void to separate component weights using a 100:45 mass ratio from the product label.
Edit example inputs
View resultsMix for the whole pour
- Capacity per cavity
- 52.75 US fl oz1,560 mL
- Total mold capacity
- 52.75 US fl oz1,560 mL
- Mixing reserve
- 6.33 US fl oz187.2 mL
- Total mixed volume
- 59.08 US fl oz1,747.2 mL
- Total mixed weight
- 67.82 oz wt1,922.7 g
- Part A volume
- 39.68 US fl oz1,173.45 mL
- Part A weight
- 46.77 oz wt1,326 g
- Part B volume
- 19.4 US fl oz573.75 mL
- Part B weight
- 21.05 oz wt596.7 g
- Pour depth exceeds the product limit you entered. Heat can build up as epoxy cures. Review the product’s depth and batch-size limits before mixing.
Worksheet inputs
- Mold shape
- Measured capacity
- Pour depth
- 1.5 in
- Measured volume per cavity
- 52.75 US fl oz
- Identical cavities
- 1
- Mixing and overpour reserve
- 12%
- Ratio basis from product label
- By weight
- Part A to Part B
- Custom A:B
- Custom parts A
- 100
- Custom parts B
- 45
- Part A density
- 1.18 oz wt/US fl oz
- Part B density
- 1.08 oz wt/US fl oz
- Product pour depth limit
- 1.18 in
Work through this example
The measured void plus reserve is 1.7472 L. The scale weights must preserve 100:45, and their individual volumes must add to the target amount.
Mixed volume = cavity volume × cavity count × (1 + reserve fraction)A rectangular mold uses length × width × depth. A cylinder uses π × radius² × depth. A full pyramid holds one-third of its bounding block. On a volume basis, split the total by the ratio and multiply each part by its own density. On a weight basis, solve for the weights whose ratio matches the label and whose volumes add to the target.
Common questions
How can I account for an uneven gap between live-edge boards?
Measure the trapped void with the boards in casting position or estimate the volume in short sections. Enter the combined capacity as a custom volume.
Do I include a cured sealing coat in the inlay volume?
Measure or estimate the remaining void after sealing. A separate seal coat belongs in its own material estimate.