Mixed-pitch main roof, porch and dormer takeoff

A renovation combines a 1,000 ft² main roof at 6:12, a 400 ft² porch at 3:12 and a 225 ft² dormer at 8:12.

Worked calculation

Convert each projected area using its own pitch factor. Together the planes cover about 1,801 ft² of deck. Check the low-slope assembly for the porch separately.

Change the inputs to test your own measurements. Reset restores this example.

Inputs

Units
Roof geometry
ft² Enter each plane’s horizontal projection. Use zero for unused planes.
:12
ft²
:12
ft²
:12
ft²
Edges and layers
ft
ft
ft
ft
Package coverage and fasteners
ft² Zero uses the nominal 3- or 4-bundle basis.
ft
ft
ft²
ft²

Results

Live

Roof plan and field shingle quantityField shingle bundles 64. Order area in roofing squares 21.25 squares. 3 MEASURED PLANESDeck 1,800.76 ft²Cut allowance 18%64 field bundles
Roof plan and field shingle quantity Schematic
Horizontal area
1,625 ft²
Measured sloped area
1,800.76 ft²
Field cut allowance
18%
Field order area
2,124.9 ft²
Starter packages
2
Ridge and hip cap bundles
3
Underlayment rolls
3
Eave ice-barrier area
300 ft²
Ice-barrier rolls
2
Field shingle nails
5,440
Field nail boxes
1
  • From 2:12 to below 4:12, verify the special underlayment application and product requirements for asphalt shingles.
  • The underlayment takeoff currently includes one layer. Review the required low-slope installation and adjust coverage.

Apply this example to your roof

Confirm the shingle label, regional code, wind fastening pattern, underlayment courses and ice-barrier extent. Membrane, starter, cap and underlayment are separate estimates. Add valleys, penetrations, overlaps and accessory fasteners as applicable.

Read the calculator method and references

Frequently asked questions

Can the dormer and porch share the main roof pitch factor?

Use each area’s own factor. Applying the 6:12 factor to every plane overstates the porch and understates the dormer.

How do I represent a roof with a fifth measured plane?

Combine projected planes that share a pitch or run a separate takeoff for the extra section. Keep shared edge items in one order.