VideoBitrateLab

The final render batch for 101 frames on 100 workers

A render wrangler has a nearly one-frame-per-node allocation for a 101-frame insert. Each frame takes about 12 seconds and staging overhead is negligible.

Example setup

Results

Results

Farm ETA
24 s
Estimated compute cost
$0.33 USD
One-worker ETA
20 min 12 s
Effective speedup
50.5 ×
Billed node-hours
0.667 h
Busy node-hours
0.337 h
Throughput
15,150 frames/h
Frames in job
101 frames

100 active workers · 2 batches.

Live diagram
Single-worker and farm timelinesOne worker 20 min 12 s. Farm 24 s with 100 active workers.ONE WORKER20 min 12 s100 WORKERS24 sOVERHEADFRAME PROCESSING50.5× faster2 work batches · 0.667 billed node-hours

Try a change

Set 101 workers or reduce the job to 100 frames. Notice the last batch disappears and the elapsed time halves under the same assumptions.

Open the full calculator

Questions

Why does one extra frame double this insert’s elapsed compute time?

One of the hundred workers needs a second 12-second batch. Completion waits for that worker.

Can the wrangler avoid paying idle time for every worker in the final batch?

Some providers let idle workers release early. This model holds the active allocation to the end, so compare your provider’s scheduling and billing policy.