Worked example · VFX & finishing
Twenty-worker render quote for 2,400 VFX frames
A VFX coordinator needs to quote a 2,400-frame shot sequence. A representative frame takes 45 seconds, twenty workers are available, and job startup takes five minutes.
Results
- Farm ETA
- 1 h 35 min
- Estimated compute cost
- $28.50 USD
- One-worker ETA
- 30 h 5 min
- Effective speedup
- 19 ×
- Billed node-hours
- 31.667 h
- Busy node-hours
- 30 h
- Throughput
- 1,515.789 frames/h
- Frames in job
- 2,400 frames
20 active workers · 120 batches.
Input settings
- Specify the sequence by
- Total frames
- Total frames
- 2400
- Measured time per frame
- 45
- Per-frame time unit
- Seconds
- Available worker nodes
- 20
- Fixed job overhead (min)
- 5
- Price per node-hour (USD)
- 0.9
Try a change
Double the worker limit and compare the new ETA with cloud cost. Each extra worker is billed during the startup interval.
Questions
How many equal-time frames must each worker process in this VFX job?
The 2,400 frames divide into twenty groups of 120 frames per worker.
Why might cloud compute cost increase at a larger worker count for this shot?
A larger pool can reduce elapsed render time while multiplying the billable job overhead. The last batch may also leave some workers idle.