Worked example · VFX & finishing
Cloud compute for a 30-second commercial
A motion designer plans a 30-second 24 fps spot. Test frames average two minutes, 36 workers are available, and each worker-hour costs $1.40.
Results
- Farm ETA
- 50 min
- Estimated compute cost
- $42.00 USD
- One-worker ETA
- 24 h 10 min
- Effective speedup
- 29 ×
- Billed node-hours
- 30 h
- Busy node-hours
- 24 h
- Throughput
- 864 frames/h
- Frames in job
- 720 frames
36 active workers · 20 batches.
Input settings
- Specify the sequence by
- Clip duration
- Sequence duration
- 0.5
- Sequence duration unit
- Minutes
- Sequence frame rate
- 24 fps
- Measured time per frame
- 2
- Per-frame time unit
- Minutes
- Available worker nodes
- 36
- Fixed job overhead (min)
- 10
- Price per node-hour (USD)
- 1.4
Try a change
Switch sequence duration to seconds and frame time to seconds. The plan remains 720 frames with the same ETA and cost.
Questions
How do I enter half a minute in the commercial duration field?
Enter 0.5 with minutes or 30 with seconds. Both represent 30 seconds at the chosen timeline rate.
Does the commercial estimate include cloud volume storage?
The calculation covers billed worker-hours. Storage, licensing, transfer, and provider billing minimums need their own allowances.