Twelve hero frames with 32 cloud workers available

A compositor assigns twelve hero frames to a burst pool with 32 possible workers. Each frame takes three minutes and a job-level sync takes four minutes.

Example setup

Results

Results

Farm ETA
7 min
Estimated compute cost
$3.85 USD
One-worker ETA
40 min
Effective speedup
5.714 ×
Billed node-hours
1.4 h
Busy node-hours
0.6 h
Throughput
102.857 frames/h
Frames in job
12 frames

12 active workers · 1 batch.

Live diagram
Single-worker and farm timelinesOne worker 40 min. Farm 7 min with 12 active workers.ONE WORKER40 min12 WORKERS7 minOVERHEADFRAME PROCESSING5.714× faster1 work batches · 1.4 billed node-hours

Try a change

Reduce workers to six. The farm needs a second full three-minute batch, while the overhead is billed across fewer machines.

Open the full calculator

Questions

Why are only twelve cloud workers active for the hero frames?

Each worker receives at least one frame. The model limits active workers to the number of renderable frames.

Does twelve active workers mean the bill is rounded to twelve whole node-hours?

The estimate uses fractional hours. Provider billing increments can change the actual amount billed.