VideoBitrateLab

Render farm time & cloud cost calculator

Estimate the finish time and cloud compute bill from your frame count, measured time per frame, and worker pool.

Setup

Results

Results

Farm ETA
1 h 35 min
Estimated compute cost
$28.50 USD
One-worker ETA
30 h 5 min
Effective speedup
19 ×
Billed node-hours
31.667 h
Busy node-hours
30 h
Throughput
1,515.789 frames/h
Frames in job
2,400 frames

20 active workers · 120 batches.

Live diagram
Single-worker and farm timelinesOne worker 30 h 5 min. Farm 1 h 35 min with 20 active workers.ONE WORKER30 h 5 min20 WORKERS1 h 35 minOVERHEADFRAME PROCESSING19× faster120 work batches · 31.667 billed node-hours

Calculation method

The duration option multiplies footage seconds by fps and rounds to the nearest frame. Workers are capped at the frame count. An even assignment requires ceil(frames ÷ active workers) batches in the equal-frame-time model.

Elapsed time is the render portion plus fixed overhead for either the one-worker run or the farm. Each active worker is billed for the farm wall time, including overhead and idle capacity in the final batch. Busy hours count frame processing alone.

Multiply billed node-hours by the entered USD rate. Account separately for minimum billing increments, licensed render slots, transfers, storage, retries and unusually slow frames.

Questions

Why can distributing 101 frames to 100 workers still take two batches?

At least one worker must receive a second frame. With equal per-frame times, the job completes when that worker finishes.

Why are billed node-hours above busy render hours?

The model bills every active worker throughout the run, including the fixed overhead and its share of idle time in the last batch.

Where should I put scene loading time in the estimate?

Use overhead for startup or teardown that happens once at the job level. Include setup in the measured per-frame average if the process repeats on each frame.