- Required SN
- 5.084
- Provided SN
- 5.187
- SN margin
- 0.103
- Extra lift
- 0
in
Flexible pavement section
Layer depths are diagrammatic. The structural contribution of each layer is calculated in US inches.
Required SN met
Marker shows provided SN relative to the required SN.
Calculation ledger
- Serviceability loss ΔPSI
- 1
- Reliability deviate Zᵣ
- -1.282
- Asphalt layer SN
- 3.3
- Granular base SN
- 1.26
- Subbase SN
- 0.627
- Entered section depth
- 22.5 in
Work through this example
- Compute allowable serviceability loss from initial and terminal PSI.
- Find the SN that carries the entered traffic in the AASHTO equation.
- Credit each layer and divide any remaining SN deficit by the asphalt layer coefficient.
Lower terminal PSI to 2.5. The allowable loss rises and the model requires less SN.
This checks total SN. Check layer-specific minimum SN, material lift sizes, seasonal drainage and local DOT criteria separately.
Read the equations and sources
Required SN met. Marker shows provided SN relative to the required SN.
Inputs
| Design traffic W₁₈ | 6,200,000 ESAL |
|---|
| Reliability R | 90% |
|---|
| Standard error S₀ | 0.45 |
|---|
| Initial serviceability p₀ | 4.2 |
|---|
| Terminal serviceability pₜ | 3.2 |
|---|
| Subgrade resilient modulus Mᵣ | 9,000 psi |
|---|
| Layer coefficient a₁ | 0.44 |
|---|
| HMA thickness D₁ | 7.5 in |
|---|
| Base coefficient a₂ | 0.14 |
|---|
| Base thickness D₂ | 9 in |
|---|
| Base drainage m₂ | 1 |
|---|
| Subbase coefficient a₃ | 0.11 |
|---|
| Subbase thickness D₃ | 6 in |
|---|
| Subbase drainage m₃ | 0.95 |
|---|
Results
| Required structural number | 5.084 |
|---|
| Provided structural number | 5.187 |
|---|
| Structural number margin | 0.103 |
|---|
| Additional HMA lift | 0 in |
|---|
| Serviceability loss ΔPSI | 1 |
|---|
| Reliability deviate Zᵣ | -1.282 |
|---|
| Asphalt layer SN | 3.3 |
|---|
| Granular base SN | 1.26 |
|---|
| Subbase SN | 0.627 |
|---|
| Entered section depth | 22.5 in |
|---|
This checks total SN. Check layer-specific minimum SN, material lift sizes, seasonal drainage and local DOT criteria separately.