A = h(c + a) + R²(θ − sin θ cos θ)
Qᵥ = 3,600 A v | Qₘ = Qᵥ ρ / 1,000
Three equal-roll trough geometry, with center roll width c = B/3 and usable belt width 0.9B − 2 in. The loaded wings have horizontal projection a and rise h. Surcharge θ is the edge tangent angle of a circular cap, with R = (c + 2a)/(2 sin θ). The cap vanishes at 0°. Match the actual idlers, edge clearance and loading condition for detailed work.
Historical CEMA running tension
Tₑ = L Kt [Kx + (Ky + 0.015) Wb] + Wm (L Ky + H) + Taux
Kx is idler resistance per unit length, Wb and Wm are belt and material weights per unit length, L is centerline length, and H is lift. Use consistent force and length units. Enter pulley, skirt and loading components as one ancillary running pull. The starting, stopping, take-up, sag and rollback checks require a separate conveyor design.
Use wrap θ in radians and Tₑ in newtons with v in m/s for kW. The tensions are the ideal minimum pair at incipient slip. Belt rating, take-up and traction allowances must be established for the installation.
Geometry only. Check rollback and belt rating separately.
Inputs
Belt width
72 in
Trough angle
35°
Surcharge angle
16°
Bulk density
105 lb/ft³
Belt speed
650 FPM
Belt length
1800 ft
Vertical lift
72 ft
Drive pulley wrap
210°
Pulley friction μ
0.35
Belt mass per length
22 lb/ft
Idler resistance Kx
0.5 lbf/ft
Flexure factor Ky
0.03
Temperature factor Kt
1
Other running pull
210 lbf
Drive efficiency
95%
Calculated values
Mass throughput
8,392.46TPH
Motor power
1,116.778HP
Effective tension Te
53,863.051lbf
Minimum tight side T1
74,525.682lbf
Minimum slack side T2
20,662.631lbf
Minimum traction T1/T2
3.607
Load cross-section
4.099ft²
Area inside trough
3.083ft²
Area above trough
1.016ft²
Volume throughput
159,856.389CFH
Running resistance
22,875.505lbf
Lift tension
30,987.546lbf
Pulley shaft power
1,060.939HP
Conveyor incline
2.292°
Industrial machinery and mobile equipment can cause fatal injuries. Use these estimates for preliminary sizing. Follow the MSHA or OSHA requirements that apply at your site. Guard moving parts and nip points, and use site lockout/tagout and hazardous-energy isolation procedures before service. Have qualified personnel verify equipment selection and operating limits.