A = h(c + a) + R²(θ − sin θ cos θ)
Qᵥ = 3,600 A v | Qₘ = Qᵥ ρ / 1,000
Three equal-roll trough geometry, with center roll width c = B/3 and usable belt width 0.9B − 2 in. The loaded wings have horizontal projection a and rise h. Surcharge θ is the edge tangent angle of a circular cap, with R = (c + 2a)/(2 sin θ). The cap vanishes at 0°. Match the actual idlers, edge clearance and loading condition for detailed work.
Historical CEMA running tension
Tₑ = L Kt [Kx + (Ky + 0.015) Wb] + Wm (L Ky + H) + Taux
Kx is idler resistance per unit length, Wb and Wm are belt and material weights per unit length, L is centerline length, and H is lift. Use consistent force and length units. Enter pulley, skirt and loading components as one ancillary running pull. The starting, stopping, take-up, sag and rollback checks require a separate conveyor design.
Use wrap θ in radians and Tₑ in newtons with v in m/s for kW. The tensions are the ideal minimum pair at incipient slip. Belt rating, take-up and traction allowances must be established for the installation.
Geometry only. Check rollback and belt rating separately.
Inputs
Belt width
24 in
Trough angle
20°
Surcharge angle
12°
Bulk density
108 lb/ft³
Belt speed
285 FPM
Belt length
72 ft
Vertical lift
8 ft
Drive pulley wrap
200°
Pulley friction μ
0.35
Belt mass per length
5 lb/ft
Idler resistance Kx
0.35 lbf/ft
Flexure factor Ky
0.03
Temperature factor Kt
1
Other running pull
32 lbf
Drive efficiency
93%
Calculated values
Mass throughput
251.526TPH
Motor power
3.457HP
Effective tension Te
372.29lbf
Minimum tight side T1
527.861lbf
Minimum slack side T2
155.571lbf
Minimum traction T1/T2
3.393
Load cross-section
0.272ft²
Area inside trough
0.185ft²
Area above trough
0.087ft²
Volume throughput
4,657.894CFH
Running resistance
136.943lbf
Lift tension
235.346lbf
Pulley shaft power
3.215HP
Conveyor incline
6.379°
Industrial machinery and mobile equipment can cause fatal injuries. Use these estimates for preliminary sizing. Follow the MSHA or OSHA requirements that apply at your site. Guard moving parts and nip points, and use site lockout/tagout and hazardous-energy isolation procedures before service. Have qualified personnel verify equipment selection and operating limits.