A = h(c + a) + R²(θ − sin θ cos θ)
Qᵥ = 3,600 A v | Qₘ = Qᵥ ρ / 1,000
Three equal-roll trough geometry, with center roll width c = B/3 and usable belt width 0.9B − 2 in. The loaded wings have horizontal projection a and rise h. Surcharge θ is the edge tangent angle of a circular cap, with R = (c + 2a)/(2 sin θ). The cap vanishes at 0°. Match the actual idlers, edge clearance and loading condition for detailed work.
Historical CEMA running tension
Tₑ = L Kt [Kx + (Ky + 0.015) Wb] + Wm (L Ky + H) + Taux
Kx is idler resistance per unit length, Wb and Wm are belt and material weights per unit length, L is centerline length, and H is lift. Use consistent force and length units. Enter pulley, skirt and loading components as one ancillary running pull. The starting, stopping, take-up, sag and rollback checks require a separate conveyor design.
Use wrap θ in radians and Tₑ in newtons with v in m/s for kW. The tensions are the ideal minimum pair at incipient slip. Belt rating, take-up and traction allowances must be established for the installation.
Geometry only. Check rollback and belt rating separately.
Inputs
Belt width
30 in
Trough angle
35°
Surcharge angle
20°
Bulk density
96 lb/ft³
Belt speed
330 FPM
Belt length
110 ft
Vertical lift
18 ft
Drive pulley wrap
180°
Pulley friction μ
0.17
Belt mass per length
8 lb/ft
Idler resistance Kx
0.35 lbf/ft
Flexure factor Ky
0.03
Temperature factor Kt
1
Other running pull
80 lbf
Drive efficiency
93%
Calculated values
Mass throughput
652.232TPH
Motor power
16.789HP
Effective tension Te
1,561.387lbf
Minimum tight side T1
3,773.415lbf
Minimum slack side T2
2,212.028lbf
Minimum traction T1/T2
1.706
Load cross-section
0.686ft²
Area inside trough
0.482ft²
Area above trough
0.204ft²
Volume throughput
13,588.169CFH
Running resistance
375.511lbf
Lift tension
1,185.877lbf
Pulley shaft power
15.614HP
Conveyor incline
9.418°
Industrial machinery and mobile equipment can cause fatal injuries. Use these estimates for preliminary sizing. Follow the MSHA or OSHA requirements that apply at your site. Guard moving parts and nip points, and use site lockout/tagout and hazardous-energy isolation procedures before service. Have qualified personnel verify equipment selection and operating limits.