Worked example · Rotary Drum

Compact kiln with steep incline

A short kiln has relatively steep fall along its active length. The reference bands are applied to the mean drum cross-section.

Live results

Sloped drum, bed section and fill band

Edit inputs
Sloped drum, bed section and fill band Four live readings and a schematic of the selected material-handling configuration. Full values follow the diagram. RESIDENCE3.25minDRUM FILL8.44%HOLDUP MASS3.23short tonsRIM SPEED81.21FPM DRUM ELEVATIONBED SECTION35 ft active length0.95 in/ft fall5.5 ft inside Ø41° repose Occupied cross-section8.44%Within the 8–15% reference band.

Within the 8–15% reference band.

All calculated values
Mean residence time
3.25min
Cross-sectional fill
8.441%
Solids holdup mass
3.229short tons
Peripheral speed
81.21FPM
Volumetric throughput
48yd³/h
Solids holdup volume
2.6yd³
Active drum volume
30.798yd³
Occupied cross-section
2.005ft²
Throughput at 8% fill
45.493yd³/h
Throughput at 15% fill
85.299yd³/h
Incline angle
4.526°

Inputs

Unit system
Operating inputs
ft
ft
in/ft
Downhill slope. The equation uses rise/run, converted from in/ft or degrees.
RPM
yd³/h
lb/ft³
°

Worked solution

Starting case in US units

  1. Convert 0.95 in/ft to rise/run. The 35 ft active length, 5.5 ft diameter and 4.7 RPM give 3.25 min residence time.
  2. Feed at 48 yd³/h accumulates 2.6 yd³ of solids. Divide by 30.8 yd³ drum volume to get 8.44% fill.
  3. At 92 lb/ft³ bulk density, holdup is 3.23 short tons. The reference fill band corresponds to 45.49 yd³/h through 85.3 yd³/h.

Try it. Switch to SI to check the incline in degrees and compare the unchanged residence time.

More worked examples

Open a different starting case

Equations and assumptions

Simplified Sullivan residence time

t = 0.19 L / (N D S)   |   S = tan α = (in/ft)/12

L and D may both be metres or both be feet. N is rpm, S is rise over horizontal run, and t is minutes. This handbook form uses a fixed 0.19 coefficient. The entered repose angle sets the drawn bed orientation. Material-specific residence time depends on repose, flights, dams, conveying action and gas flow.

Holdup, fill and rim speed

Vhold = Qᵥ t/60   |   Vdrum = πD²L/4
Fill = 100 Vhold/Vdrum   |   Mhold = ρ Vhold   |   v = πDN/60

Steady-state holdup uses Qᵥ in m³/h. Cross-sectional fill is an average for a uniform inside diameter. The 8–15% visual window is a preliminary loading reference and identifies under-fill and potential cascading overload. A computed fill above 100% signals an infeasible steady-state estimate.