Worked example · Rotary Drum

High-fill pilot rotary dryer

A small dryer is fed at a rate that pushes holdup above the nominal cascading band.

Live results

Sloped drum, bed section and fill band

Edit inputs
Sloped drum, bed section and fill band Four live readings and a schematic of the selected material-handling configuration. Full values follow the diagram. RESIDENCE9.29minDRUM FILL33.45%HOLDUP MASS4.21short tonsRIM SPEED42.41FPM DRUM ELEVATIONBED SECTION22 ft active length0.4 in/ft fall4.5 ft inside Ø39° repose Occupied cross-section33.45%Above 15%. Potential cascading overload.

Above 15%. Potential cascading overload.

All calculated values
Mean residence time
9.289min
Cross-sectional fill
33.45%
Solids holdup mass
4.213short tons
Peripheral speed
42.412FPM
Volumetric throughput
28yd³/h
Solids holdup volume
4.335yd³
Active drum volume
12.959yd³
Occupied cross-section
5.32ft²
Throughput at 8% fill
6.697yd³/h
Throughput at 15% fill
12.556yd³/h
Incline angle
1.909°

Inputs

Unit system
Operating inputs
ft
ft
in/ft
Downhill slope. The equation uses rise/run, converted from in/ft or degrees.
RPM
yd³/h
lb/ft³
°

Worked solution

Starting case in US units

  1. Convert 0.4 in/ft to rise/run. The 22 ft active length, 4.5 ft diameter and 3 RPM give 9.29 min residence time.
  2. Feed at 28 yd³/h accumulates 4.33 yd³ of solids. Divide by 12.96 yd³ drum volume to get 33.45% fill.
  3. At 72 lb/ft³ bulk density, holdup is 4.21 short tons. The reference fill band corresponds to 6.7 yd³/h through 12.56 yd³/h.

Try it. Compare a lower feed rate with a higher RPM. Both affect fill, while only the RPM changes rim speed.

More worked examples

Open a different starting case

Equations and assumptions

Simplified Sullivan residence time

t = 0.19 L / (N D S)   |   S = tan α = (in/ft)/12

L and D may both be metres or both be feet. N is rpm, S is rise over horizontal run, and t is minutes. This handbook form uses a fixed 0.19 coefficient. The entered repose angle sets the drawn bed orientation. Material-specific residence time depends on repose, flights, dams, conveying action and gas flow.

Holdup, fill and rim speed

Vhold = Qᵥ t/60   |   Vdrum = πD²L/4
Fill = 100 Vhold/Vdrum   |   Mhold = ρ Vhold   |   v = πDN/60

Steady-state holdup uses Qᵥ in m³/h. Cross-sectional fill is an average for a uniform inside diameter. The 8–15% visual window is a preliminary loading reference and identifies under-fill and potential cascading overload. A computed fill above 100% signals an infeasible steady-state estimate.

References