Worked example · Rotary Drum

Higher-speed rotary cooler

A rotary cooler uses higher speed to limit residence time at increased throughput.

Live results

Sloped drum, bed section and fill band

Edit inputs
Sloped drum, bed section and fill band Four live readings and a schematic of the selected material-handling configuration. Full values follow the diagram. RESIDENCE3.44minDRUM FILL5.76%HOLDUP MASS8.98short tonsRIM SPEED197.92FPM DRUM ELEVATIONBED SECTION57 ft active length0.6 in/ft fall9 ft inside Ø32° repose Occupied cross-section5.76%Under-fill. Below the 8% reference.

Under-fill. Below the 8% reference.

All calculated values
Mean residence time
3.438min
Cross-sectional fill
5.76%
Solids holdup mass
8.981short tons
Peripheral speed
197.92FPM
Volumetric throughput
135yd³/h
Solids holdup volume
7.736yd³
Active drum volume
134.303yd³
Occupied cross-section
3.664ft²
Throughput at 8% fill
187.503yd³/h
Throughput at 15% fill
351.569yd³/h
Incline angle
2.862°

Inputs

Unit system
Operating inputs
ft
ft
in/ft
Downhill slope. The equation uses rise/run, converted from in/ft or degrees.
RPM
yd³/h
lb/ft³
°

Worked solution

Starting case in US units

  1. Convert 0.6 in/ft to rise/run. The 57 ft active length, 9 ft diameter and 7 RPM give 3.44 min residence time.
  2. Feed at 135 yd³/h accumulates 7.74 yd³ of solids. Divide by 134.3 yd³ drum volume to get 5.76% fill.
  3. At 86 lb/ft³ bulk density, holdup is 8.98 short tons. The reference fill band corresponds to 187.5 yd³/h through 351.57 yd³/h.

Try it. Change the material repose angle to see the drawn bed rotate, then adjust RPM to see the actual residence time response.

More worked examples

Open a different starting case

Equations and assumptions

Simplified Sullivan residence time

t = 0.19 L / (N D S)   |   S = tan α = (in/ft)/12

L and D may both be metres or both be feet. N is rpm, S is rise over horizontal run, and t is minutes. This handbook form uses a fixed 0.19 coefficient. The entered repose angle sets the drawn bed orientation. Material-specific residence time depends on repose, flights, dams, conveying action and gas flow.

Holdup, fill and rim speed

Vhold = Qᵥ t/60   |   Vdrum = πD²L/4
Fill = 100 Vhold/Vdrum   |   Mhold = ρ Vhold   |   v = πDN/60

Steady-state holdup uses Qᵥ in m³/h. Cross-sectional fill is an average for a uniform inside diameter. The 8–15% visual window is a preliminary loading reference and identifies under-fill and potential cascading overload. A computed fill above 100% signals an infeasible steady-state estimate.

References