Worked example · Rotary Drum

Shallow-slope limestone kiln

A long kiln runs at a shallow incline and relatively low speed. The estimate treats the active volume as a uniform cylinder.

Live results

Sloped drum, bed section and fill band

Edit inputs
Sloped drum, bed section and fill band Four live readings and a schematic of the selected material-handling configuration. Full values follow the diagram. RESIDENCE36.48minDRUM FILL11.32%HOLDUP MASS50.15short tonsRIM SPEED94.25FPM DRUM ELEVATIONBED SECTION120 ft active length0.25 in/ft fall10 ft inside Ø36° repose Occupied cross-section11.32%Within the 8–15% reference band.

Within the 8–15% reference band.

All calculated values
Mean residence time
36.48min
Cross-sectional fill
11.322%
Solids holdup mass
50.151short tons
Peripheral speed
94.248FPM
Volumetric throughput
65yd³/h
Solids holdup volume
39.52yd³
Active drum volume
349.066yd³
Occupied cross-section
8.892ft²
Throughput at 8% fill
45.93yd³/h
Throughput at 15% fill
86.118yd³/h
Incline angle
1.193°

Inputs

Unit system
Operating inputs
ft
ft
in/ft
Downhill slope. The equation uses rise/run, converted from in/ft or degrees.
RPM
yd³/h
lb/ft³
°

Worked solution

Starting case in US units

  1. Convert 0.25 in/ft to rise/run. The 120 ft active length, 10 ft diameter and 3 RPM give 36.48 min residence time.
  2. Feed at 65 yd³/h accumulates 39.52 yd³ of solids. Divide by 349.07 yd³ drum volume to get 11.32% fill.
  3. At 94 lb/ft³ bulk density, holdup is 50.15 short tons. The reference fill band corresponds to 45.93 yd³/h through 86.12 yd³/h.

Try it. Increase the slope to 0.5 in/ft and compare the change to mean residence time and steady holdup.

More worked examples

Open a different starting case

Equations and assumptions

Simplified Sullivan residence time

t = 0.19 L / (N D S)   |   S = tan α = (in/ft)/12

L and D may both be metres or both be feet. N is rpm, S is rise over horizontal run, and t is minutes. This handbook form uses a fixed 0.19 coefficient. The entered repose angle sets the drawn bed orientation. Material-specific residence time depends on repose, flights, dams, conveying action and gas flow.

Holdup, fill and rim speed

Vhold = Qᵥ t/60   |   Vdrum = πD²L/4
Fill = 100 Vhold/Vdrum   |   Mhold = ρ Vhold   |   v = πDN/60

Steady-state holdup uses Qᵥ in m³/h. Cross-sectional fill is an average for a uniform inside diameter. The 8–15% visual window is a preliminary loading reference and identifies under-fill and potential cascading overload. A computed fill above 100% signals an infeasible steady-state estimate.

References