Worked example · Stockpile

Dry sand cone at 30° repose

A clean sand cone is inventoried using a measured 60-foot footprint on level ground.

Live results

Stockpile elevation and footprint

Edit inputs
Stockpile elevation and footprint Four live readings and a schematic of the selected material-handling configuration. Full values follow the diagram. PILE VOLUME604.6yd³WET MASS783.56short tonsDRY MASS783.56short tonsTRUCKLOADS32 PILE ELEVATIONBASE FOOTPRINT60 ft base ØConical pileHeight 17.32 ft30° repose Final truck payload used34.25%Truck count uses wet mass and the entered payload.

Truck count uses wet mass and the entered payload.

All calculated values
Stockpile volume
604.6yd³
Wet pile mass
783.561short tons
Dry solids mass
783.561short tons
Truckloads
32
Calculated pile height
17.321ft
Base footprint
2,827.433ft²
Cone, frustum or end volume
604.6yd³
Straight windrow volume
0yd³
Water mass
0short tons
Final truck payload used
34.245%

Inputs

Unit system
Operating inputs
ft
°
lb/ft³
%
Water mass divided by the as-stockpiled wet mass.
short tons

Worked solution

Starting case in US units

  1. The 60 ft base width and 30° repose angle yield a pile height of 17.32 ft.
  2. The curved portion contributes 604.6 yd³. Total volume is 604.6 yd³.
  3. Apply 96 lb/ft³ and 0% moisture to get 783.56 short tons wet and 783.56 short tons dry. Hauling at 25 short tons per trip takes 32 truckloads.

Try it. Check that wet and dry mass coincide at 0% moisture. Then add a moisture value to see its effect on dry solids.

More worked examples

Open a different starting case

Equations and assumptions

Conical or flat-top pile

H = (R − r) tan θ   |   V = (πH/3)(R² + Rr + r²)

R and r are base and top radii. The cone has r = 0. The input repose angle is measured up from horizontal. Measure its actual slope where the pile profile or material varies.

Round-ended windrow

Lstraight = Ltotal − 2R
V = πR²H/3 + RH · Lstraight

The rounded ends are two half-cones. The straight middle is a triangular prism with base width 2R. End-to-end length includes both rounded ends. This geometry assumes level ground and a straight, level crest.

Moisture and hauling

Mwet = ρwet V   |   Mdry = Mwet(1 − w)
Truckloads = ceil(Mwet / payload)

Enter as-stockpiled wet bulk density and wet-basis water fraction w. The last load is often partial. Actual payload depends on equipment, site conditions and applicable weight limits.