Worked example · Warehouse planning

High-bay freezer pallet capacity

A high-bay cold room has more usable vertical space and a higher planned level count than a typical warehouse.

Rack positions
6,115
Annual energy
1,249,170kWh/yr
Annual cost
149,900USD/yr
Peak draw
255.1kW
Edit inputs

Inputs

Edit any value to recalculate.

Storage footprint

Use one storage position footprint including the assigned rack clearance around the pallet.

m
m
m
m
m
%
m
m
Refrigeration load profile
kW
kW/TR
h/day
%
%
kW
days
Electric defrost & tariff

The currency changes the billing label. Enter the local rate per kWh in that currency.

kW
cycles/day
min
%
USD/kWh

Available clear height limits the rack levels below the entered target.

Annual refrigeration electricity

Annual refrigeration electricityElectric heaters and the compressor work required to remove retained defrost heat appear as two separate energy uses.Energy use / kWh per operating yearBase compressor1,036,598Defrost heaters29,784Defrost recovery7,588Auxiliaries175,200Annual total1,249,170 kWh

Electric heaters and the compressor work required to remove retained defrost heat appear as two separate energy uses.

Calculation breakdown

Energy cost per position per month
2.04USD/position/mo
Usable rack levels
5
Positions per rack level
1,223
Net rack floor area
1,727.3m²
Equivalent full-load hours per day
15.3h/day
Base compressor electricity
1,036,598kWh/yr
Defrost heater electricity
29,784kWh/yr
Defrost heat returned to room
20,849kWhₜₕ/yr
Defrost recovery electricity
7,588kWh/yr
Auxiliary electricity
175,200kWh/yr
Defrost heater on-time
1.2h/day

Work through this case

  1. Net rack floor area 1,727.3m²
  2. Usable rack levels 5
  3. Rack positions 6,115

Check the area allowance and overhead clearances against the rack design. The screen counts area-equivalent positions before row geometry.

More worked examples

Open a case with its assumptions loaded, then edit the inputs.

Open base calculator

Formulas and assumptions

Rack positions

positions = floor(net area / pitch footprint) × min(planned, height-limited levels)

The area factor covers circulation and unavailable floor area. The clear height check uses the overhead clearance and rack level pitch. Verify rows, egress, fire protection, and structure separately.

Energy and defrost

kWh = base compressor + heater + defrost recovery + auxiliaries

Apply peak and off-peak load percentages over their daily hours. Heater kWh is power × cycles × cycle hours × days. Convert retained room heat into compressor recovery electricity at the entered kW/TR.

Peak and cost

annual cost = annual kWh × tariff • position cost = annual cost / (positions × 12)

Peak adds the compressor, active heater, and auxiliaries if they run together. With staging, the compressor draw must cover its daily energy and defrost recovery during the heater-off hours. If that requires more than rated draw, the staged peak is unavailable. The tariff estimate covers energy charges.

References

Questions and answers

What should I check in the high-bay freezer pallet capacity example?

Check the area allowance and overhead clearances against the rack design. The screen counts area-equivalent positions before row geometry.