The area factor covers circulation and unavailable floor area. The clear height check uses the overhead clearance and rack level pitch. Verify rows, egress, fire protection, and structure separately.
Apply peak and off-peak load percentages over their daily hours. Heater kWh is power × cycles × cycle hours × days. Convert retained room heat into compressor recovery electricity at the entered kW/TR.
Peak adds the compressor, active heater, and auxiliaries if they run together. With staging, the compressor draw must cover its daily energy and defrost recovery during the heater-off hours. If that requires more than rated draw, the staged peak is unavailable. The tariff estimate covers energy charges.
What should I check in the mixed frozen distribution room example?
Compare direct heater electricity and compressor recovery electricity before estimating annual energy cost per position.
ColdChainLab · Engineering calculation
Mixed frozen distribution room
Metric SI · https://calcsheetlab.com/coldchainlab/cold-storage-warehouse-energy/mixed-frozen-distribution-room/
Inputs
Interior length
42 m
Interior width
25 m
Interior height
9 m
Overhead clearance
0.8 m
Rack level pitch
1.8 m
Planned rack levels
4
Aisles & non-rack area
47 %
Position length
1.26 m
Position width
1.12 m
Reference refrigeration load
240 kW
Compressor input per ton
1.28 kW/TR
Peak profile length
9 h/day
Peak load fraction
90 %
Off-peak load fraction
48 %
Continuous auxiliary power
6 kW
Operating days per year
365 days
Active defrost heater power
42 kW
Defrost cycles
3 cycles/day
Time per defrost cycle
24 min
Defrost heat left in room
70 %
Compressor and heater timing
Loads may overlap
Billing currency
USD · US dollar
Electricity rate
0.145 USD/kWh
Results
Rack positions
1,576
Annual energy
563,453kWh/yr
Annual cost
81,701USD/yr
Peak draw
126.6kW
Energy cost per position per month
4.32USD/position/mo
Usable rack levels
4
Positions per rack level
394
Net rack floor area
556.5m²
Equivalent full-load hours per day
15.3h/day
Base compressor electricity
487,811kWh/yr
Defrost heater electricity
18,396kWh/yr
Defrost heat returned to room
12,877kWhₜₕ/yr
Defrost recovery electricity
4,687kWh/yr
Auxiliary electricity
52,560kWh/yr
Defrost heater on-time
1.2h/day
Use these estimates for preliminary engineering. Verify results against validated cold-chain qualification protocols, applicable ASHRAE Standards 15 and 34, and local food and pharmaceutical regulations. Use manufacturer data, measured operating conditions, and approved acceptance criteria before acting on a result.