FactoryOEELab

Worked example · Quality economics

Electronics rework bench cost

Annualize bench labor for an electronics line with an 8% rework rate and 7.5 minutes per affected board.

Recovery sales = Annual COPQ ÷ Net margin

Baseline reading

The 5,120 board rework events average one-eighth hour each, for 640 annual bench hours valued at 32 per hour.

What to test

Sample touch time by rework category. If retest or waiting consumes constrained capacity, track that impact alongside booked labor.

Currency labels entered amounts. Exports record the selected display units.

Inputs

Annual production and unit economics
$
$
$
Internal failures
%
%
min
$/hr
External failures and margin
%
$
%

Results

Total annual COPQ
$32,368.00
COPQ as a share of sales
3.2254%
Sales needed to recover COPQ
$462,400.00
Failure cost and recovery sales
Failure cost and recovery sales Annual scrap, rework, and warranty costs, followed by a separate comparison of total failure cost with equivalent recovery sales. ANNUAL FAILURE COSTScrap$6.4KRework$20.5KWarranty$5.5KSALES TARGET AT NET MARGINCOPQRecovery sales$32.4K$462.4K
Internal failure cost
$26,880.00
External failure cost
$5,488.00
Annual scrap cost
$6,400.00
Annual rework cost
$20,480.00
Modeled sales revenue
$1,003,520.00
Saleable units
62,720 units
Modeled warranty claims
156.8 units

Model notes

Enter mutually exclusive scrap and successful rework rates over gross production. The warranty rate applies to the remaining saleable units.

Reconcile material, labor, claims, and margin with plant accounting. Recovery sales use net margin and express the sales needed to generate profit equal to the failure cost.

View the equations

Frequently asked questions

Should queue time be included as bench labor for each board?

Use attributable paid work time and included burden for the labor estimate. Track waiting and bottleneck opportunity cost separately if relevant to your decision.

Where should replacement components appear in board rework cost?