FactoryOEELab

Equations & operating assumptions

Calculation methodology

Review how each worksheet turns plant measurements into results and where to verify the model before use.

OEE, calendar utilization, and the Six Big Losses

OEE = (Run ÷ Planned) × (Ideal cycle × Total ÷ Run) × (Good ÷ Total)

Run time is planned production time less unplanned downtime and scheduled setup stops inside the production window. The three terms are availability, performance, and quality. OEE also equals good count × ideal cycle ÷ planned time. TEEP divides that same fully productive time by the entire matching calendar window.

Availability losses are breakdowns and setup or adjustments. Performance losses are minor stops and reduced speed. Quality losses are production rejects and startup rejects. Convert each time loss to units by dividing by the ideal cycle. Subtract counted first-pass rejects as units. Ideal planned output minus all these losses reconciles to first-pass good output.

Use consistent elapsed time, a validated ideal cycle and first-pass counting. Apply an agreed small-stop threshold. For a mixed product schedule, aggregate ideal times by product before comparing OEE.

Open OEE & TEEP

Yamazumi, staffing and bottleneck capacity

Balance efficiency = Total work content ÷ (Entered stations × Bottleneck cycle)

Subtract breaks and meetings from gross available shift time, then divide the remainder by demand to get takt. The greatest observed station time sets the steady-state cycle. Round down net time divided by that cycle for modeled maximum shift output.

Display each station cycle as a bar against takt. Balance delay is one minus balance efficiency. The minimum station bound is total work time divided by takt, rounded up.

The bound assumes redistributable work. Apply task precedence, operator skills, safe work standards, changeovers, variation and line fill when planning staffing.

Open Takt time & staffing

Opportunity defects, first pass and inverse-normal sigma

DPMO = Defects × 1,000,000 ÷ (Inspected units × Opportunities per unit)

DPU divides defects by units. Opportunity yield is one minus the fraction of opportunities failed. Unit FPY uses the distinct failed-unit count when supplied. Without that count, exp(−DPU) estimates the Poisson probability of zero defects on a unit.

RTY multiplies sequential conditional first-pass step yields. The one-sided sigma equivalent solves P(Z > z) = DPMO ÷ 1,000,000 for a standard normal Z. The optional convention adds 1.5σ to the resulting z, so 3.4 DPMO gives approximately 6.00σ in shifted mode.

The normal-tail solver brackets and inverts the CDF numerically. Zero and full defect opportunity rates have no finite point equivalent. Keep the opportunity definition and shift convention consistent across comparisons.

Open DPMO & sigma level

Process capability, Taguchi Cpm and tail PPM

Cpm = (USL − LSL) ÷ (6 × √(σ² + (μ − Target)²))

Cp uses specification width over six within-process standard deviations. Cpu and Cpl use distances from the mean to the upper and lower limits divided by three deviations. Cpk is the smaller one-sided index. Pp and Ppk use overall deviation instead. The off-center shift uses distance from the specification midpoint as a fraction of half specification width.

The model adds the normal lower tail below LSL to the normal upper tail above USL and multiplies by one million. Small tails are evaluated directly to retain precision. Cross-check the distribution shape and measurement system before using a tail estimate for lot release.

Cpm uses a functional target supplied by engineering. The plot shows deviations from the mean and marks limits even when they are beyond the visible scale.

Open Process capability

Kanban card count, reserve and inventory turns

Cards = ceil(Daily demand × Lead-time days × (1 + Safety factor) ÷ Units per bin)

Use an operating-day basis for both demand and replenishment. Multiply cards by container capacity for the maximum. Subtract unbuffered lead-time demand to find the reserve after rounding.

The average inventory assumes a linear drawdown between full stock and reserve before batch replenishment. Divide annual usage by that average for loop turns. Multiply the average or maximum by unit standard cost for average or peak capital.

A two-bin policy is supported by a calculated two-container need under the stated demand and lead time. Verify the actual trigger, batch cadence and variability on the floor.

Open Kanban & two-bin sizing

Machine burden, setup and batch pricing

Hourly rate = (Acquisition ÷ Useful life + Annual burden) ÷ Billable hours + Labor ÷ Machines per operator

Annual burden includes floor space, power, tooling and maintenance. Billable hours are available hours times utilization. The acquisition term assumes straight-line depreciation and zero salvage value.

Allocate one setup to the saleable batch. Divide per-start run and material by expected yield to estimate cost per good part. Multiply cost by one plus markup for the quoted unit price.

The four price breaks hold setup, cycle, material and scrap constant. Check repeat setups, risk premiums, taxes and the approved costing basis before sending a quote.

Open Machine rate & batch quote

Exact finite-lot and binomial operating characteristics

Pa = Σ P(X = k), for sampled defect counts k ≤ Ac

For the binomial use independent draws at rate p. For a finite lot, use a fixed count D, rounded from N × p. The hypergeometric probability at k is C(D, k) × C(N − D, n − k) ÷ C(N, n). The probability mass is evaluated by recurrence from its mode to avoid large factorials.

Producer risk is rejection at AQL. Consumer risk is acceptance at the separate RQL or LTPD point. For rectifying inspection, binomial AOQ is Pa × p × (N − n) ÷ N. Exact finite-lot AOQ sums P(X = k) × (D − k) ÷ N over accepting sample counts. Both require full screening of rejected lots and replacement of detected defectives.

The curves evaluate a single-sample plan entered by the reader. Obtain the contractual inspection level, lot disposition, switching rules and plan from the applicable ISO 2859-1 or ANSI/ASQ Z1.4 tables.

Open AQL & OC curve

Internal failure, external failure and sales recovery

Recovery sales = (Scrap cost + Rework cost + Claim cost) ÷ Positive net margin

Scrap and rework rates apply to gross production as disjoint outcomes. Annual scrap uses material plus labor per lost unit. Rework multiplies affected units by hours and labor burden. Warranty claims are based on saleable production after scrap.

Total failure cost divided by modeled saleable revenue produces the COPQ share. At a positive net margin, dividing COPQ by that margin gives sales whose profit would equal the loss.

Validate net scrap value, warranty cohorts, booked sales and incremental margin with plant accounting. Track prevention and appraisal costs separately when reporting total cost of quality.

Open Scrap, rework & COPQ

Model references

Vorne’s OEE and TEEP calculation references describe the six equipment losses. Lean Enterprise Institute’s Operator Balance Chart describes work elements against takt. The NIST/SEMATECH e-Handbook of Statistical Methods, sections 6.1.6 and 6.2.2, covers capability and single-sample OC and AOQ models.

Use the edition and table specified by the purchase or quality agreement for ISO 2859-1 or ANSI/ASQ Z1.4.