Diesel Budget for Heavy Disk Tillage
Model a 24-foot disk at 5.2 mph and 85% efficiency, then compare diesel cost on 122 acres with a high PTO load.
Planning estimate
- Effective field capacity
- 12.86 ac/h
- Theoretical field capacity
- 15.13 ac/h
- Total time in field
- 9.49 h
- Ideal pass time at full utilization
- 8.06 h
- Time allowed for field losses
- 1.42 h
- Estimated fuel burn per hour
- 12.3 gal/h
- Estimated fuel burn per area
- 0.956 gal/ac
- Estimated diesel for this pass
- 116.66 US gal
- Estimated fuel cost per area
- $3.87 per ac
- Estimated total fuel cost
- $472.49
Field note
Rated PTO power is the tractor rating. Enter the assumed equivalent share demanded by the operation and use measured fuel data where available.
Questions from the field
Why is PTO load still used for a drawbar implement?
The fuel estimate uses load expressed as equivalent PTO power. Use a measured or defensible equivalent for the pull required.
Should I lower field efficiency for slower passes on a hill?
Use typical productive-pass speed for slope-related speed changes. Apply efficiency to time or width losses that remain unaccounted for.