Three-cable pull through 1¼ in. EMT

Check three 8 mm cables, a 90° bend and an 85 m straight after the bend.

Inputs

Choose the raceway and size, then enter the measured bore and cable outside diameter. Open Bend and pull to enter the planned route details.

Conduit and cable bundle
mm
mm
Bend and pull
mm
°
m
N/m
μ
N
N
Cable minimum bend factors
×
×
LIVE ANATOMY

Conduit cross-section and pull profile

Conduit cross-section and pull profileCONDUIT FILL15.627%LOADED BEND160mmPULL TENSION247.332NPULL ROOM2,421.6NAREA EQUIVALENTPULL PROFILE3 cables · 15.6%Bore 35.05 mmBend 90°Out 247.33 NINSTALLATION LIMIT USE0%100% limit64% used
Within entered limitsThe entered fill, loaded bend radius and tension screens pass.

Conduit and bends

Internal conduit area
964.974 mm²
Total cable area
150.796 mm²
Calculated fill
15.627 %
NEC fill limit
40 %
Minimum static bend radius
80 mm
Minimum loaded bend radius
160 mm

Pull profile

Tension exiting bend
198.372 N
Straight-run contribution
48.96 N
Total pull tension
247.332 N
Rated tension remaining
2,421.6 N
Estimated sidewall load
793.49 N/m

What to check

Use the 40% fill limit for three cables and compare the loaded bend radius with the actual bend.

Open the general conduit fill & pull tension calculator

Formulas and assumptions

Conduit area and NEC fill

Fill (%) = 100 × count × (cable OD / conduit ID)²

NEC Chapter 9 Table 1 uses 53% for one cable, 31% for two and 40% for three or more when that table applies. The diagram shows equivalent area. Installation clearances and jamming depend on the actual cable geometry.

Static and loaded bends

Rstatic = 10 × OD; Rloaded = 20 × OD

These are editable planning multipliers. Compare the planned bend with the cable manufacturer’s loaded minimum and use the actual measured bore for fill.

Capstan pull model

Tout = Tin × e^(μθ) + μ × W × L

Enter the bend angle in degrees. The model uses radians, total bundle weight per length W, and a horizontal straight section after the bend. Sidewall loading at the bend exit is a simple tension/radius estimate.

EMT uses nominal planning bores. The Schedule 40 PVC presets use minimum electrical-conduit bores from the linked CANTEX drawing. HDPE uses IPS SDR 13.5 geometry before wall tolerances. Enter the actual product bore and verify the locally adopted code. The initial 600 lbf threshold is about 2,669 N. Some cable sheets specify 2,700 N separately. Enter the actual cable or pulling assembly rating and plan complex or inclined pulls section by section.

Worked examples

Open a scenario and edit any parameter.