Calculation methodology

Trace what each model measures, where its assumptions apply, and which limits need a datasheet or field measurement.

Power and distance

Enter power relative to one milliwatt in dBm. Enter attenuation and allowances as positive dB deductions. We add physical component losses first, then subtract the entered engineering reserve from the budget. Overload uses the high launch and the physical path. Metric and US views convert from the same stored engineering values.

Channel and plant limits

Check dispersion against transceiver tolerances, modal reach against an Ethernet PHY and WDM plans against the optics and filters. Replace planning values with measured bore, cable ratings, power and plant loss. An OTDR trace helps locate events. An optical source and power meter measure end-to-end insertion loss.

Models by tool

PON splitter budget

B+ and C+ follow the G.984.2/G.9807.1 class-window convention. N1 and N2 use the G.9807.1 basic wavelength set. C++ is a vendor profile. PX20 uses the EPON planning window. The TX/RX entries are editable presets and the route cap represents an entered equipment limit. Verify wavelength plans, splitters, differential reach and equipment interoperability separately.

Multimode Ethernet reach

The 850 nm planning table uses IEEE 802.3 Clauses 38, 52, 86, 95, 112 and 138 with manufacturer guidance for OM5. The original Gigabit SX table predates OM3 through OM5. This calculator uses the conservative OM2 envelope for those grades. For newer 850 nm PHYs, OM5 uses the corresponding OM4 planning values. Check the optic for vendor-specific distances and any lane skew or return-loss requirements.

Conduit fill & pull tension

EMT uses nominal planning bores. The Schedule 40 PVC presets use minimum electrical-conduit bores from the linked CANTEX drawing. HDPE uses IPS SDR 13.5 geometry before wall tolerances. Enter the actual product bore and verify the locally adopted code. The initial 600 lbf threshold is about 2,669 N. Some cable sheets specify 2,700 N separately. Enter the actual cable or pulling assembly rating and plan complex or inclined pulls section by section.