Three-Coat Epoxy for a 12 × 14 Workroom Floor

Estimate separate base, flood, and seal coat volumes for a 168-square-foot floor with a 3:1 volume ratio.

Project inputs

Surface and coats
ft
ft
mils
mils
mils
Mix and containers
US gal
%
View shopping list

Shopping list

3 kitsMixed epoxy kit 1 US gal mixed per kit · 3:1 by volume

Mixed volume with reserve
2.304 gal · 294.91 fl oz · 8.72 L
Part A
1.728 US gal
Part B
0.576 US gal
Total coat thickness
20 mils

Coating thickness section Coating thickness sectionSubstrateBasecoat4 milsFlood coat12 milsSeal coat4 mils168 ft² coated · 2.304 mixed US gal
Schematic layout

Worked takeoff

  1. Measure the coated face

    14 ft length × 12 ft width = 168 ft²

  2. Basecoat

    168 ft² × 4 mils thickness, plus 10% reserve = 0.461 US gal.

  3. Flood coat

    168 ft² × 12 mils thickness, plus 10% reserve = 1.382 US gal.

  4. Seal coat

    168 ft² × 4 mils thickness, plus 10% reserve = 0.461 US gal.

  5. Split the mixed volume and buy whole kits

    2.304 US gal at 3:1 by volume gives 1.728 US gal Part A and 0.576 US gal Part B. Divide by 1 US gal and round up to 3 kits.

Check before you buy

The three layers share one volumetric ratio in this example. Verify product compatibility, wet film thickness, and how much kit volume is mixed material.

Use the product’s specified mix ratio by volume, coverage, maximum layer thickness, and working time. Measure the average channel width at several points for a river and make separate takeoffs for products with different ratios.

Frequently asked questions

How much total film thickness does the three-coat floor use?

The 4, 12, and 4 mil inputs add to 20 mils, equal to 0.020 in or 0.508 mm.

What fraction of a 3:1 kit is Part B?

Part B makes up one of the four measured volume parts. That is 25% of the mixed volume.