A 20° curve with nominal chord stationing
Compare nominal 100 ft chord stations with the longer true arc.
More examplesSurvey anatomy
Circular curve stationing
Computed results
60° / 180°
Station labels use the nominal chord span. Arc offsets and straight stake chords use exact circular geometry.
Circular curve elements
- Radius R
- 287.93852ft
- Tangent T
- 166.24138ft
- True arc length
- 301.52852ft
- Long chord LC
- 287.93852ft
- External E
- 44.54424ft
- Middle ordinate M
- 38.57645ft
- Reference arc degree
- 19.898615°
- Reference chord degree
- 20°
Control stations
- PC · Curvature
- 13+33.759ft
- PI · Intersection
- 15+00.000ft
- PT · Tangency
- 16+33.759ft
- Station span
- 300ft
- PT deflection from PC
- 30°
Deflections and subchords
| Point | Stationft | Arc from PCft | Deflection° | Subchordft | Chord from PCft |
|---|---|---|---|---|---|
| PC | 13+33.759 | 0 | 0 | 0 | 0 |
| Stake | 13+50.000 | 16.32414 | 1.62414 | 16.32195 | 16.32195 |
| Stake | 14+00.000 | 66.57889 | 6.62414 | 50.19099 | 66.43067 |
| Stake | 14+50.000 | 116.83364 | 11.62414 | 50.19099 | 116.03381 |
| Stake | 15+00.000 | 167.08839 | 16.62414 | 50.19099 | 164.75386 |
| Stake | 15+50.000 | 217.34315 | 21.62414 | 50.19099 | 212.22004 |
| Stake | 16+00.000 | 267.5979 | 26.62414 | 50.19099 | 258.07109 |
| PT | 16+33.759 | 301.52852 | 30 | 33.91099 | 287.93852 |
Worked check
A 100 ft chord subtends 20° and sets the radius. Three nominal chord units give a 300 ft station span. The true arc remains Rπ/3.
- Radius (ft)
- 287.9385242
- Nominal station span (ft)
- 300
- True arc length (ft)
- 301.5285174
These checks describe the original example. Reset restores the original inputs.
Formulas and conventions
Choose a degree convention
R = b ÷ Dᵣₐd (arc) · R = b ÷ [2 sin(D ÷ 2)] (chord)
The reference length b is a 100 ft arc or chord by common U.S. convention. It is editable for project-specific bases. True arc stationing is the highway default. Nominal chord stationing uses bΔ ÷ Dchord and reports true arc length separately.
Locate PC, PI and PT
T = R tan(Δ ÷ 2) · Arc = RΔᵣₐd · PC = PI − T · PT = PC + station span
The long chord is 2R sin(Δ ÷ 2). External distance is T tan(Δ ÷ 4). Middle ordinate is R[1 − cos(Δ ÷ 2)]. The field sketch mirrors for left-hand turns.
Stake from the tangent at PC
Deflection = θ ÷ 2 · Subchord = 2R sin[(θᵢ − θᵢ₋₁) ÷ 2]
Place stakes at even station-interval multiples between the two endpoints. Compute θ as the fraction of station span times Δ and use circular geometry for exact straight chords. Left deflection is negative.
More worked examples
Open a case to edit its inputs and compare the original checks.
- A 60° circular highway curve
Find tangent, arc and long chord for a 300 m radius with 60° of intersection.
- A 10° curve by the 100 ft arc
Derive radius and arc length from the customary highway degree definition.
- Left-hand curve with signed deflections
Check the sign and magnitude of a left-hand full-curve deflection.
- Short curve between station marks
Generate the PC and PT even when no full stake goes between them.
- 100 ftUS reference chord
Read a legacy degree of curvature measured with a U.S. survey-foot chord.
GeoSurveyLab · Field calculation
A 20° curve with nominal chord stationing
60° / 180°
Field inputs
- Working unit
- International foot (ft)
- Curve input
- Degree · chord basis
- Intersection angle Δ
- 60 °
- Turn
- Right
- Degree of curve D
- 20 °
- Degree reference length
- 100 ft
- PI station
- 15+00 ft
- Stake interval
- 50 ft
- Station basis
- Nominal chord length
Circular curve elements
- Radius R
- 287.9385ft
- Tangent T
- 166.2414ft
- True arc length
- 301.5285ft
- Long chord LC
- 287.9385ft
- External E
- 44.5442ft
- Middle ordinate M
- 38.5764ft
- Reference arc degree
- 19.8986°
- Reference chord degree
- 20°
Control stations
- PC · Curvature
- 13+33.759ft
- PI · Intersection
- 15+00.000ft
- PT · Tangency
- 16+33.759ft
- Station span
- 300ft
- PT deflection from PC
- 30°
Deflections and subchords
| Point | Stationft | Arc from PCft | Deflection° | Subchordft | Chord from PCft |
|---|---|---|---|---|---|
| PC | 13+33.759 | 0 | 0 | 0 | 0 |
| Stake | 13+50.000 | 16.3241 | 1.6241 | 16.3219 | 16.3219 |
| Stake | 14+00.000 | 66.5789 | 6.6241 | 50.191 | 66.4307 |
| Stake | 14+50.000 | 116.8336 | 11.6241 | 50.191 | 116.0338 |
| Stake | 15+00.000 | 167.0884 | 16.6241 | 50.191 | 164.7539 |
| Stake | 15+50.000 | 217.3431 | 21.6241 | 50.191 | 212.22 |
| Stake | 16+00.000 | 267.5979 | 26.6241 | 50.191 | 258.0711 |
| PT | 16+33.759 | 301.5285 | 30 | 33.911 | 287.9385 |
For planning, training, and independent checks. Have a locally licensed Professional Land Surveyor (PLS) verify legal boundaries and survey control. Have a licensed Professional Engineer (PE) verify engineering layout and design where required.