Eight corners at large grid coordinates
Check a chamfered block without losing precision to large coordinate offsets.
More examplesSurvey anatomy
Parcel & roadway cross sections
Computed results
Areas agree
Boundary geometry
- Shoelace area
- 9,200m²
- Square feet
- 99,027.97583ft²
- Acres
- 2.27337ac
- Hectares
- 0.92ha
- DMD area
- 9,200m²
- Perimeter
- 353.13708m
- Point order
- Counterclockwise
Roadway volumes
- Average end area
- 1,560m³
- Average end area
- 2,040.40297yd³
- Prismoidal volume
- 1,240m³
- Prismoidal volume
- 1,621.85877yd³
- Correction Cₚ
- 320m³
- Correction Cₚ
- 418.5442yd³
Boundary courses and DMD
| Leg | Start Nm | Start Em | ΔNm | ΔEm | DMDm | DMD × ΔNm² |
|---|---|---|---|---|---|---|
| 1 | 300,000 | 2,000,020 | 0 | 60 | 60 | 0 |
| 2 | 300,000 | 2,000,080 | 20 | 20 | 140 | 2,800 |
| 3 | 300,020 | 2,000,100 | 60 | 0 | 160 | 9,600 |
| 4 | 300,080 | 2,000,100 | 20 | −20 | 140 | 2,800 |
| 5 | 300,100 | 2,000,080 | 0 | −60 | 60 | 0 |
| 6 | 300,100 | 2,000,020 | −20 | −20 | −20 | 400 |
| 7 | 300,080 | 2,000,000 | −60 | 0 | −40 | 2,400 |
| 8 | 300,020 | 2,000,000 | −20 | 20 | −20 | 400 |
Worked check
A 100 m square loses four 20 by 20 m right triangles. Moving the same geometry to a large grid offset preserves the 9,200 m² area.
- Enclosed area (m²)
- 9,200
- DMD area (m²)
- 9,200
- Perimeter (m)
- 353.137085
These checks describe the original example. Reset restores the original inputs.
Formulas and conventions
Compute plane-coordinate area
Signed double area = Σ(EᵢNᵢ₊₁ − Eᵢ₊₁Nᵢ)
Use three to eight distinct corners in perimeter order. The perimeter sums straight edges. The absolute half-sum is enclosed area. Positive signed area corresponds to counterclockwise order in a north-up plan.
Cross-check by DMD
DMD₁ = ΔE₁ · DMDᵢ = DMDᵢ₋₁ + ΔEᵢ₋₁ + ΔEᵢ · Area = |Σ(DMDᵢΔNᵢ)| ÷ 2
Both methods translate to a local origin before calculation. Acres use the International-foot definition; square U.S. survey feet are also reported when that working unit is selected.
Compare two roadway section volumes
AEA = L(A₁ + A₂) ÷ 2 · V = L(A₁ + 4Aₘ + A₂) ÷ 6 · Cₚ = AEA − V
Take Aₘ at the true midpoint. The prismoidal formula is exact for a prismoid and for a quadratic cross-section area profile. Compare like cut or fill areas. Positive Cₚ means average end area overstates the prismoidal volume.
More worked examples
Open a case to edit its inputs and compare the original checks.
- Rectangular parcel and constant section
Check a 60 by 40 m parcel and a constant-area roadway section.
- Triangular parcel and roadway wedge
Compute a right-triangle parcel and check a linearly changing end area.
- Concave woodlot and broad midsection
Subtract a triangular notch and check a negative prismoidal correction.
- Clockwise legacy survey-foot parcel
Check a clockwise 43,560 ftUS² enclosure and volume conversion from survey-foot sections.
- Positive prismoidal correction in a roadway reach
Compare unequal end areas with a midsection smaller than their average.
GeoSurveyLab · Field calculation
Eight corners at large grid coordinates
Areas agree
Field inputs
- Working unit
- Meters (m)
- Number of corners
- 8
- Boundary coordinates 1
- 300000 / 2000020
- Boundary coordinates 2
- 300000 / 2000080
- Boundary coordinates 3
- 300020 / 2000100
- Boundary coordinates 4
- 300080 / 2000100
- Boundary coordinates 5
- 300100 / 2000080
- Boundary coordinates 6
- 300100 / 2000020
- Boundary coordinates 7
- 300080 / 2000000
- Boundary coordinates 8
- 300020 / 2000000
- Station separation
- 30 m
- First section A₁
- 42 m²
- Midsection Aₘ
- 36 m²
- Last section A₂
- 62 m²
Boundary geometry
- Shoelace area
- 9,200m²
- Square feet
- 99,027.9758ft²
- Acres
- 2.2734ac
- Hectares
- 0.92ha
- DMD area
- 9,200m²
- Perimeter
- 353.1371m
- Point order
- Counterclockwise
Roadway volumes
- Average end area
- 1,560m³
- Average end area
- 2,040.403yd³
- Prismoidal volume
- 1,240m³
- Prismoidal volume
- 1,621.8588yd³
- Correction Cₚ
- 320m³
- Correction Cₚ
- 418.5442yd³
Boundary courses and DMD
| Leg | Start Nm | Start Em | ΔNm | ΔEm | DMDm | DMD × ΔNm² |
|---|---|---|---|---|---|---|
| 1 | 300,000 | 2,000,020 | 0 | 60 | 60 | 0 |
| 2 | 300,000 | 2,000,080 | 20 | 20 | 140 | 2,800 |
| 3 | 300,020 | 2,000,100 | 60 | 0 | 160 | 9,600 |
| 4 | 300,080 | 2,000,100 | 20 | −20 | 140 | 2,800 |
| 5 | 300,100 | 2,000,080 | 0 | −60 | 60 | 0 |
| 6 | 300,100 | 2,000,020 | −20 | −20 | −20 | 400 |
| 7 | 300,080 | 2,000,000 | −60 | 0 | −40 | 2,400 |
| 8 | 300,020 | 2,000,000 | −20 | 20 | −20 | 400 |